Published April 28, 2025 at 8:00 PM

Updated April 29, 2025

Paving for a sidewalk / parking lot in Nashville, Tennessee. Working plans call for paving for a sidewalk / parking lot.

As of April 28, 2025, an engineer has been selected. Right of Way is in process and design is at 90% plans. It is anticipated bidding will commence in summer 2026 with construction following in 2026. The closed solicitation has been included below for reference. A detailed scope has not been released. This project will construct an 8-foot sidewalk, 4-foot furnishing zone, and curb/gutter along the east side of Dickerson Pike with ADA ramps, markings, and an improved and more visible crossing at Gatewood Avenue. The new sidewalk will run from the intersection of Douglas Avenue to Trinity Lane. This project will extend the existing sidewalk infrastructure, which currently ends at Douglas Avenue. This project is federally funded, locally managed and is monitored by the TDOT Local Programs Development Office. Environmental/NEPA: Completed January 2018 Design (Plan Development): In -progress Right-of-way Acquisition: Start TBD (12-month duration) Utility Coordination: In-progress Estimated Construction Start: TBD Estimated Construction Duration: 12 months Construction Completion Date: TBD *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Final Planning

Sidewalks / Parking Lot

$6,150,000.00

Public - County

Paving

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
77
Bidding Soon
1,293
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

Dickerson Pike, Nashville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.