Site work and paving for a mixed-use development in Thornton, Colorado. Completed plans call for site work for a water / sewer project; road / highway; sidewalk / parking lot; for paving for a road / highway; and sidewalk / parking lot.

There are DWG files available in addendum one. The Project consists of upgrades to the existing treated water system near the intersection of 92nd Avenue and Colorado Boulevard. Specifically, it includes the furnishing and installing of an underground 12-inch pressure reducing vault, SCADA system including connection to existing fiber optic backbone, electrical service, connecting to existing 16-inch asbestos cement water line, sidewalk, curb and gutter reconstruction, patching asphalt paving, erosion control, traffic control and landscape restoration and as further described in the Contract Documents. Question Acceptance Deadline 04/18/2022 07:00 PM EDT Questions are submitted online No Buyer's Requirements General Requirements - Insurance Required - Contractors License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 %

Bid Results

Water / Sewer

$468,342.00

Public - City

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete, Concrete Curing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Traffic Coatings
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Facility Water Distribution Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
50
Bidding Soon
938
All Active Projects
373
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

June 27, 2022

img_map_placeholder

E 92nd Ave & Colorado Blvd, Thornton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.