BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Daytona Beach, Florida. Working plans call for the renovation of a municipal facility.

Bids rejected These items will be re-solicited with a new solicitation number at a later date Question Deadline 08/31/2023 at 11:30 PM ET This project entails replacement of the fire escape stairs on the exterior of the building and associated work, including but not limited Removal and disposal of the existing fire escape stairs Removal of windows Filling in the window space with a brick exterior Removal of the rear entry doors Installation of new rear entry doors Structural repairs to the concrete structure Bids which contain modifications, incomplete, unbalanced, conditional, obscure, or which contain additions not requested, or irregularities of any kind, or which do not comply in every respect with the instructions to Bidders and the Contract documents may be rejected at the option of the County. The County does not bind itself to accept the minimum Bid stated herein, but reserves the right to accept any Bid, the County deems to be the lowest Responsive and Responsible Bidder, and which in the judgment of the County will best serve the needs and interests of the County. All licenses and permits required to perform Bidder's duties under this Bid Contract whether such license or permit is required by the federal government, State of Florida, Volusia County, or any municipality, shall be at Bidder's sole cost and expense, and shall not be a cost of the County. All required licenses and permits shall be maintained in full force and effect during the term of this Bid Contract. A Bid bond shall accompany each Bid in an amount not less than five percent (5%) of the Bid amount and shall be valid for a period not less than one hundred twenty (120) days. If a Bid bond is used, the Bidder shall complete and submit the Bid bond form provided in this solicitation The County Performance and Payment Bond form shall be used. No other forms will be accepted without prior approval from the County. Simultaneously with the delivery of the executed Contract to the County, a Bidder to whom a Contract has been awarded must deliver to the County, executed, separate performance and payment bonds on the prescribed forms, each in an amount of one hundred percent (100%) of the Contract price of the accepted Bid proposal as security for the faithful performance of his Contract and for the payment of all persons performing labor or furnishing materials in connection therewith.

Final Planning

Municipal

$150,000.00

Public - County

Renovation

11

12

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
46
Bidding Soon
1,044
All Active Projects
440
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 16, 2023

img_map_placeholder

440 S Beach St, Daytona Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.