BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Los Gatos, California. Completed plans call for site work for a water / sewer project.

As of April 26, 2022, project was awarded to Advanced Geotechniques, Inc., but awarded amount is not available. This project involves the construction of soldier pile retaining wall with tiebacks, midwest guardrail system, reconstructed roadway, drainage improvements, erosion control and revegetation. The successful bidder shall furnish a payment bond and a performance bond. The Contractor shall possess a Class A license at the time that this contract is awarded. The Department of Public Works hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Bidders are advised that, as required by federal law, the County of Santa Cruz is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DBE). The DBE Contract Goal is 3 percent. In addition, bidders shall provide documentation showing that adequate good faith efforts were made to meet the goal as required in the Special Provisions. Attention is directed to the Federal minimum wage rate requirements in the Proposal and the State general prevailing wage rate requirements in the Special Provisions. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate.

Award

Water / Sewer

$554,630.00

Public - County

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
67
Bidding Soon
1,403
All Active Projects
612
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 23, 2022

img_map_placeholder

Mountain Charlie Rd, Los Gatos, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.