BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Cape Coral, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Selection Method : Low Bid AREHNA PROJECT NO. M-21-046.005 - SITE 3 Response Requested : Bid Proposal / Technical Financial Management Numbers : 44626715201 44788415201 44914015202 Safety Improvement Projects, Lee and Collier Counties TRC Members (Subject to Change) : Gerald Byrne Katherine Chinault Walter Breuggeman The Florida Department of Transportation (FDOT) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design, permitting and construction of three (3) safety improvement projects located within Collier and Lee Counties. FPID 447884-1-52-01 establishes a raised median for access management purposes and intersection improvements along SR 867 from Cypress Lake Drive to Edinburgh Drive in Lee County. FPID 446267-1-52-01 replaces the existing traffic signal on US 41 at the Crystal Drive intersection in Lee County. FPID 449140-1-52-01 adds a new pedestrian hybrid beacon signal at the existing SR 84 pedestrian crossing for the Rich King Memorial Greenway Trail in Collier County. Estimated Contract Time: 600 Days All questions for this project must be submitted through the Department's Bid Question and Answer website LBDB Qualification Validation Form Due Date 6/03/2022 Tech Proposal Due Date/Time 6/06/2022 Bid Price Due Date/Time 6/06/2022 Bid Opening Date/Time 6/06/2022 Technical Review Committee Meeting 1 Date/Time 6/09/2022 Final Selection Date/Time 6/14/2022 FDOT - RFP D/B - Safety Improvement Projects, Lee and Collier Counties Safety Improvement Projects, Lee and Collier Counties The Florida Department of Transportation (FDOT) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design, permitting and construction of three (3) safety improvement projects located within Collier and Lee Counties. FPID 447884-1-52-01 establishes a raised median for access management purposes and intersection improvements along SR 867 from Cypress Lake Drive to Edinburgh Drive in Lee County. FPID 446267-1-52-01 replaces the existing traffic signal on US 41 at the Crystal Drive intersection in Lee County. FPID 449140-1-52-01 adds a new pedestrian hybrid beacon signal at the existing SR 84 pedestrian crossing for the Rich King Memorial Greenway Trail in Collier County.

Award

Roads / Highways

$2,197,061.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
27
Bidding Soon
473
All Active Projects
184
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2022

July 19, 2022

img_map_placeholder

Multiple Locations, Cape Coral, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.