Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 7, 2023 at 8:00 PM
Updated January 26, 2024
Site work, paving and new construction of a bridge / tunnel in Evansville, Indiana. Conceptual plans call for the construction of a bridge / tunnel.
-West Alternative 1 is estimated to cost $1.47 billion. The proposal calls for a 4-lane I-69 bridge and a U.S. 41 bridge for local traffic, as well as a reconstructed U.S. 60 interchange and new Watson Lane and U.S. 41/Veterans Memorial Parkway interchanges. -West Alternative 2 is estimated to cost $1.49 billion. The proposal calls for a 6-lane I-69 bridge and would take away the two current U.S. 41 bridges and include a reconstructed U.S. 60 interchange and new Watson Lane, Wolf Hills/Stratman Road, Nugent Drive and U.S. 41/Veterans Memorial Parkway interchanges. -Central Alternative 1 is estimated to cost $1.42 billion. The proposal calls for a 4-lane I-69 bridge and use of one U.S. 41 bridge for local traffic, as well as new U.S. 41, U.S. 60 and Veterans Memorial Parkway interchanges. Section 2 - Bistate project between Kentucky and Indiana. • The new 4-lane Ohio River bridge will connect I-69 in Henderson and Evansville. • Estimated cost: $975 million (year of expenditure) • Timeline: o 2025 – Design o 2026 – Right-of-way acquisition and utilities coordination o 2027-2031 – Construction As of September 7, 2023, the Final Environmental Impact Statement and Record of Decision are complete Information regarding design team and contractor selection has not been disclosed. A firm timeline has not been established. Pre-construction activities are expected to begin in 2025 and construction is expected to begin in 2027. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Conceptual
Bridges / Tunnels
$975,000,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 4, 2027
I-69, Evansville, IN
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
