BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Minneapolis, Minnesota. Completed plans call for site work for a bridge / tunnel; and transportation facility.

The work of this project includes The project includes installing fully functional heat trace into an existing system in the Light Rail Transit (LRT) guideway Interchange bridge on the METRO Blue Line and Green Line LRT systems. The Work for this Project includes, but is not limited to the following: 1. Interchange Bridge a. The CONTRACTOR will remove and replace the existing heat trace in the eight shelter drains and add heat trace to the two new drains next to the pedestrian crossing on the southwest side of Target Field Platform. b. The CONTRACTOR will use the existing heat trace electrical panel, relay module and breaker in pictures 1 to 3. c. The CONTRACTOR will perform the work above deck during a shutdown weekend starting Friday, June 3rd to Monday at 3 AM June 6th, 2022. The backup weekend will be Friday, June 17th to Monday at 3 AM June 20th, 2022. d. The CONTRACTOR will install heat trace in the two track drains to the sanitary manhole. Pictures of the drains under the deck are shown in Picture 4. e. The CONTRACTOR will penetrate the deck through the handhole next to the electrical panel. Picture 5. The 2nd penetration will be through the vault, fastened along the concrete along both tracks and into the two existing drains in Picture 5. f. All exposed electrical wires will be enclosed in rigid conduit. g. The shelter drains on the platform will have heat trace to the vertical drain on pier 4. The two track drains will have heat trace to the storm drain manhole. h. The CONTRACTOR will provide a fully functional heat trace system. i. The CONTRACTOR will supply Metro Transits rail insurance. j. All CONTRACTOR employees working on this project will take the Metro Transit Rail Safety On-Line Course and have the certificate at the job site. k. The CONTRACTOR will coordinate with the CAR and Target Field for access below the bridge deck. Target Field will grant access through the North Gate with authorization.

Award

Transportation Terminals

$85,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
70
Bidding Soon
1,695
All Active Projects
590
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2022

June 6, 2022

September 4, 2022

img_map_placeholder

408 N 5th St, Minneapolis, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.