BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Cape May, New Jersey. Completed plans call for site work for a water / sewer project.

It is essential that any contaminated soil or groundwater encountered during the Project be handled in a manner that is protective of human health, safety, and the environment. This Section describes procedures for the management of regulated material (contaminated or potentially contaminated soil and/or groundwater) that may be encountered throughout the Project area. The work shall include the excavation, handling, stockpiling, sampling, analysis, and the ultimate disposal or reuse of contaminated soil, if encountered. The work shall also include the dewatering, treatment, sampling, analysis, and the ultimate disposal of contaminated groundwater, if encountered. Proposals are invited for Contract No. A900.655, which involves the replacement of 1.5-inch, 2-inch, 3-inch, 4-inch and 6-inch water mains at the Pleasant Plains Police Barracks (GSP Milepost 83.8), Garden State Parkway Interchange 109 Toll Plaza (GSP Milepost 109.8 to 110.4), Raritan Toll Plaza Safety Building ( GSP Milepost 125.6 to 125.7), and the New Jersey Turnpike Authority Maintenance Yard TMD-10 (TP Milepost 112.7S) in the Township of Toms River, Township of Middletown, Borough of Sayreville, and the Borough of East Rutherford, New Jersey. Trench Excavation, Earth - 2494 Cubic Yards 6in Ductile Iron Water Pipe, Class 350 - 1845 Linear Feet 12 Inch Trenchless Installation - 146 Linear Feet 2in Copper Water Pipe, Type K - 1255 Linear Feet All work under the Contract shall be performed and completed on or before August 4, 2023 If the Contractor fails to complete fully, entirely and in conformity with the provisions of the Contract, the Project and each and every part and appurtenance thereof, within the time stated above, or any portion for which a Completion Date is stipulated within such further time as may have been granted in accordance with the provisions of the Contract, then the Contractor shall and hereby agrees to pay the Authority for each and every calendar day that it is in default on time to complete the entire Project, $2,000 which said amount per calendar day is agreed upon by the parties hereto to be liquidated damages and not a penalty. (a)If said Proposal shall be rejected by the New Jersey Turnpike Authority, or in the alternative, (b) If said Proposal shall be accepted by the New Jersey Turnpike Authority, and the Principal shall duly execute the Contract Agreement and furnish the required Contract Bond, within the stipulated time, Then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall, in no event, exceed the amount of this obligation as herein stated.

Award

Water / Sewer

$1,494,505.00

Public - State/Provincial

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
50
Bidding Soon
1,053
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2022

October 7, 2022

img_map_placeholder

Multiple Locations, Cape May, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.