Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Fort Wayne, Indiana. Completed plans call for the renovation of a educational facility.
For: 2022 Mercury Containing Flooring Removal Activity Room Shawnee Middle School 1000 East Cook Road Fort Wayne, Indiana 46825 P/B Bid tfo. BD 101656 Each bid proposal shall include all labor, material and services necessary to complete the projects in strict accordance with the project specifications as prepared and on file in the office of: ACM Engineering & Environmental Services, Inc. 839 Mill Lake Road, Suite 400 Fort Wayne, Indiana 46845 The Project Base Bid Proposal consists or the proper removal and disposal of Mercury containing flooring in accordance with all EPA, OSHA, state, and local re standards ana requirements in the Activity Room, east entrance area, and west entrance area at Shawnee Middle School. Wage rates shall not be less than the prevailing wage rates as determined pursuant to the Wage Rate Decision of the Secretary of US Department of Labor establishing the minimum wage rates which contractors shall pay skilled and unskilled labor. Bids received after that time or in another location shall be returned to the bidder unopened. Each bid proposal shall be accompanied by a certified check, a cashiers check or a bid bond executed by a surety company which is authorized to do business in the State of Indiana, made payable to the Fort Wayne Community Schools and in an amount equal to five percent (5%) of the bid proposal. In the event sixty (60) days following the time and date designated for the receipt of bids without the consent of Fort Wayne Christopher M. Nancarrow Clerk 3-22, 3-29, 4-5 hspaxlp Community Schools. Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all Informalities, irregularities and/or inconsistencies in, or with respect to. any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion. Board of School Trustees a bidder withdraws its bid or fails to execute a satisfactory contract within thirty (30) days after the contract is awarded to such bidder by Fort Wayne Community Schools, Fort Wayne Community Schools may declare the certified check, cashier s check or bid bond forfeited to Fort Wayne Community Schools, as liqui- dated damages. A bid proposal may not be modified, withdrawn or cancelled by the bidder Fort Wayne Community Schools reserves the right to reject any and all bids or waive any or all informalities, irregularities and/or inconsistencies in, or with respect to, any or all bids. Performance and Labor and Material Payment Bonds in an amount equal to one hundred percent (100%) of the contract amount shall be required to be provided by the successful bidder to Fort Wayne Community Schools or its assignee no later than ten (10) days after the execution of such contract. Such bonds shall remain in full force and effect for a period of twelve (12) months after the date of Substantial Completion.
Post-Bid
Educational
$200,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
May 30, 2022
1000 E Cook Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: May 13 2022
Fort Wayne, IN
Bid Date: Mar 31 2022
Fort Wayne, IN
Bid Date: May 17 2022
Fort Wayne, IN
Bid Date: May 11 2022
Fort Wayne, IN
Bid Date: May 12 2022
Fort Wayne, IN
Bid Date: Apr 28 2022
Fort Wayne, IN
Bid Date: May 12 2022
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: May 12 2022
Fort Wayne, IN
--
Fort Wayne, IN
Bid Date: May 05 2022
Fort Wayne, IN
Bid Date: Apr 28 2022
Fort Wayne, IN
Bid Date: Mar 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.