Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in San Jose, California. Contact the soliciting agency for additional information.
Scope of Services Valley Water is seeking bids from responsive, responsible, and qualified firms ("Bidders" or "Bidder") to provide the following: A. In accordance with the Specifications, the Supplier will fabricate, manufacture, assemble, test, store and deliver the following items: 11. One (1) raw water 84-inch valve assembly consisting of an 84-inch triple eccentric metal seated butterfly valve and electric actuator completely assembled 2. One (1) raw water 24-inch valve assembly consisting of a 24-inch triple eccentric metal seated butterfly valve and electric actuator completely assembled 3. Two (2) treated water 66-inch valve assembly consisting of a 66-inch triple eccentric metal seated butterfly valve and electric actuator completely assembled 4. Two (2) treated water 48-inch valve assemblies consisting of 48-inch triple eccentric metal seated butterfly valve and electric actuator completely assembled 5. Eight (8) treated water 24-inch valve assemblies consisting of 24-inch triple eccentric metal seated butterfly valve and electric actuator completely assembled Within ten calendar days, not including Sundays and legal holidays, of Valley Water's Notice of Award, the successful Bidder must submit a performance bond or payment bond executed by the Contractor and the surety, equal to 100 percent of the bid amount. A California admitted sureties must issue all bonds . Q&A Deadline 01/24/2023 4:00 PM (PST) The Supplier's attention is directed to Section 3 Schedule and Liquidated Damages of these Specifications, for the required deadlines and associated liquidated damages to be assessed if these deadlines are not met by the Supplier. In the event that the valves and actuators to be supplied pursuant to a Purchase Order issued by Valley Water are not fabricated and delivered in accordance with the requirements of these Specifications, and because it is impractical and extremely difficult to ascertain and determine the actual and consequential damages or claims which Valley Water may sustain in the event of and by reason of such delay, it is therefore agreed that the Supplier, at Valley Water's option, shall pay to Valley Water liquidated damages; and the Supplier further agrees that Valley Water may deduct the amount thereof from any monies due, or that may become due, to the Supplier pursuant to the Purchase Order issued by Valley Water. If the Supplier fails to deliver the valves and actuators and otherwise fully comply with these Specifications and in accordance with the terms and conditions of the Purchase Order within the time-frame indicated in Section 3.01 - Schedule, liquidated damages in the amount of $3,000 may be assessed for each calendar day after the delivery date referenced in Article 3.01 and until all materials to be supplied have arrived at Valley Water's construction site and been accepted by the Engineer.
Post-Bid
Water / Sewer
$650,000.00
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2023
August 1, 2023
Multiple Locations, San Jose, CA
Related To This Project
San Jose, CA
Bid Date: Nov 07 2022
San Jose, CA
Bid Date: Nov 09 2022
San Jose, CA
Bid Date: Nov 17 2022
San Jose, CA
Bid Date: Oct 02 2023
San Jose, CA
--
San Jose, CA
--
San Jose, CA
Bid Date: Nov 22 2022
San Jose, CA
Bid Date: May 18 2020
Weed, CA
Bid Date: Nov 22 2022
Windsor, CA
Bid Date: Oct 13 2022
Paramount, CA
Bid Date: Nov 01 2022
Sunnyvale, CA
Bid Date: Oct 13 2022
Rialto, CA
--
Lompoc, CA
Bid Date: Jul 13 2022
Baldwin Park, CA
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.