Published May 30, 2023 at 8:00 PM

Updated August 20, 2025

Site work for a civil project in Santa Barbara, California. Completed plans call for site work for a water / sewer project.

Liquidated Damages $1,140 per day The estimated construction cost is $5,100,000 Location and Description. The Project is located at 404 Alan Road, Santa Barbara, California and is described as follows Question Deadline 01/23/2023 at 3:00 PM PT Online Q&A Yes Questions may be directed to: Barbara August, SWRCB Barbara.August@waterboards.ca.gov Phone: (916) 341-6952 Fax: (916) 327-7469 The Work involves rehabilitation of the Braemar Lift Station. It consists of replacement of existing pumps, valves, and piping, replacement of existing ventilation fans and ducting in the dry well, replacement of valve vaults, installation of new variable frequency drives, construction dry flood proofing measures, and replacement of existing motor control center and control system. The Project site is located at the Braemar Lift Station situated on the corner of Cliff Drive and Alan Drive, Santa Barbara, California. The Project is intended to replace aging equipment, and address long standing issues with odor control and operational and maintenance challenges. The limits of work are restricted to north of the existing sidewalk, south of the dry well and electrical room, and directly east of the existing station. The limits of works are restricted to developed, disturbed, and ornamental areas measuring roughly 640 square feet within the limits of the existing Braemar Lift Station. Construction is scheduled to begin August 2022 and complete October 2023. The work generally includes replacement of the existing pumps and motors with new units including Variable Frequency Drives (VFD). Other work items include the ventilation system, wet well, motor control center, supervisory control and data acquisition system, the removal of two site walls and exterior piping, replacing pumping and electrical systems, rehabilitation of the wet-well interior, and replacement of outiet piping and valves adjacent to the building. There will be demolition of the existing ornamental planter area to provide for relocation of the emergency pump bypass connections, including construction of a new catch basin and drain piping, which is proposed to be graded and revegetated after construction. Revegetation will follow the policies designated in the City of Santa Barbara's Coastal Land Use Program / Coastal Land Use Plan (2019), including Policy 4-1.19 (Plantings within ESHA Buffer) and Policy 4.1-36 (Bird Breeding and Nesting). PROJECT NO. 48367, BID NO. 5439 The City anticipates work to begin on or about March, 2023. The construction completion is 670 calendar days.

Award

Water / Sewer

$6,479,626.00

Public - City

Site Work

131

45

17

7

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
70
Bidding Soon
812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

April 10, 2023

Project location map

404 Alan Rd, Santa Barbara, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.