BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Burlington, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Brighton, Kenosha County is seeking proposals for repaving 41st Street beginning at the intersection with 308th Avenue and continuing east through the intersection of CTK "B" to Town Road (2.02 miles). Also, repaving Town Road from its beginning (approximately .75 miles east of CTK "B" (288th Ave) ) to its end at CTK "NN" (52nd St) (1.22 miles) Brighton also requests a break out of work area divided into 2 sections (approx. 1.25 miles 308th Ave to CTK "B" AND approx. 1.97 miles CTK "B" to CTK "NN")The project is to include the following: o Pulverize to a depth of 6 inches; fine grade and compact existing asphalt pavement to utilize as base for a new pavement cross-section. o Undercut one foot below sub grade any areas that fail during proof roll o Geo grid to be placed with 3 inch stone with 1.25 inch TB top coat to sub grade o Construct a two-course 3.5 inch asphalt pavement in the roadway area above consisting of a 2 inch binder course and a 1.5 inch surface course. o Provide tack coat between lifts of asphalt. o Install a one foot wide and 4 inch depth, limestone shoulder on each side of the new roadway. o Paint 4" yellow centerlines (passing and no passing zones as current) and 4" white shoulder striping Contact Susan Crane, Town Chair with questions at 414-333-8843 The Town Board of Brighton reserves the right to reject any or all proposals and to waive technicalities. Unless the proposals are rejected for good cause, award of contract shall be made to the lowest responsible and responsive submitter. NOTE: Wisconsin Dept. of Workforce Development excludes towns under 2,500 in population from requiring a prevailing wage rate determination on projects

Award

Roads / Highways

$681,700.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
115
Bidding Soon
1,968
All Active Projects
818
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

May 11, 2022

img_map_placeholder

41st St, Burlington, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.