BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in City of Wilkes Barre, Pennsylvania. Completed plans call for the renovation of a municipal facility.

Luzerne County invites qualified vendors to submit a proposal to provide for the replacement of an Existing Chilled Water Coil and Hot Water Coil for Air Handling Unit #5. If you have any questions concerning the equipment or specific details on the scope of work for this project, please contact Val Timonte at 570-829-7741 ext. 4700. All vendors and contractors may be required to submit a Performance Bond to Luzerne County Purchasing upon contract award. Contract Terms: The contract term is from May 09, 2022 to May 09, 2023. The County Manager and administrative officers reserve the right to reject any and all RFPs or specifications when deemed to the best interest of the County and also to purchase any, part, or none of the materials specified. The Luzerne County Division of Corrections invites qualified vendors to submit a proposal to provide for the replacement of an Existing Chilled Water Coil and Hot Water Coil for AHU #5 located at 99 Water Street Wilkes-Barre, PA. Please submit your proposal based on the Scope of Work section of this document. There is no expressed or implied obligation for Luzerne County to reimburse responding vendors for any expenses incurred in preparing proposals in response to this request. Perform a site visit to insure a complete understanding of the project and existing site conditions and construction restraints. Lump sum cost to include all equipment, labor and materials (tax exempt). All materials used for this project should be submitted to LCCF Maintenance Department for approval prior to project start. Once the project is complete, the contractor is responsible for cleanup of the project site. Take apart AH by Sections and Remove Defected CW/HW-Coil and Dispose of. Supply Crane and Rigging Company to remove and install CW/HW-Coil. Supply and install All Necessary piping Copper Piping and Insulation. Supply and install all necessary Controls. Turn water back on and leak check. Perform full system operation checkout. Include 1- year Parts/ labor warranty. Project duration time should not exceed more than 30 days from Notice to Proceed.

Post-Bid

Municipal

$200,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
83
Bidding Soon
1,182
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

May 9, 2022

img_map_placeholder

99 Water St, City of Wilkes Barre, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.