Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a fitness / recreation center in Winnipeg, Manitoba. Completed plans call for the renovation of a fitness / recreation center.
The Work to be done under the Contract shall consist of replacement of air handler AH-1, boilers, controls, fire dampers in pool area and north mechanical room, The areas in the building related to this work will be shut down for a period from August 15, 2022 to November 12, 2022. The major components of the Work are as follows: (a) Replacement of the existing natural gas fired air handling unit AH-1 with a new hydronic air handling unit. (b) Replacement and expansion of existing boilers located in mechanical penthouse associated Work. (c) Replacement/upgrade of the existing controls including damper actuators of existing air handling unit AH-2 located in the south mechanical room. (d) Replacement of all fire dampers on AH-1 and AH-2 supply air ductwork between the main- floor and the basement. (e) Replacement of all fire dampers in north and south mechanical rooms. (f) Installation of new fire rated ceiling in north stairwell and associated electrical, mechanical and sprinkler line modifications. (g) Repair north mechanical room fire separation walls Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Award
Fitness / Rec Centers
$737,399.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2022
August 17, 2022
999 Sargent Ave, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Aug 12 2022
Winnipeg, MB
Bid Date: Jun 20 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 05 2022
Winnipeg, MB
Bid Date: Aug 12 2022
Winnipeg, MB
Bid Date: Jun 09 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 12 2022
Winnipeg, MB
Bid Date: Apr 28 2022
Winnipeg, MB
Bid Date: May 02 2022
Winnipeg, MB
Bid Date: May 27 2022
Winnipeg, MB
Bid Date: May 31 2022
Winnipeg, MB
Bid Date: Jun 22 2022
Winnipeg, MB
Bid Date: Aug 11 2022
Winnipeg, MB
Bid Date: Aug 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
