BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 13, 2023 at 7:00 PM

Updated January 26, 2024

Renovation of an educational facility in Cottonwood Heights, Utah. Completed plans call for the renovation of a educational facility.

This notice is for those interested in this solicitation. CSD has moved its bidding platform over to Ion Wave. You MUST submit your offer through that system. Please follow the link and register. All information is available on that site. Effective October 25, 2021, Canyons School District is pleased to announce a new online procurement platform for the solicitation of goods and services. If you are interested in doing business with the Canyons School District, you will need to register as a supplier to receive notifications when new solicitations are posted. Scope of work includes replacing all existing lighting within Canyon View Elementary with new LED lighting as well as introducing lighting controls (occupancy/vacancy detection, daylight harvesting, etc.) as required to comply with current energy codes. Existing lighting to be replaced 1 for 1 throughout most spaces. The existing grid structure and light placement is unconventional but will be maintained to minimize clashes above ceiling between existing equipment and new lights, and minimize interruption to the ceiling grid system. 1.2.2 Some instances of existing lights have been removed and will be replaced with a new ceiling tile grid. All existing ceiling devices/elements excluding existing light fixtures are to remain in place. The electrical contractor may remove devices from the ceiling temporarily if required for access but must reinstall any and all existing devices, ceiling grids, wiring, etc that was impacted. 1.2.3 All existing exit signs will be replaced. 1.2.4 Most existing classrooms already have emergency power provided to a light however some spaces require extending the nearest emergency circuit for new emergency lighting within the space. 1.2.5 Existing platform lighting within the gym is to be replaced. 1.2.6 Existing contactor system within the gym to be replaced and new emergency lighting to be introduced. 1.2.7 Work is expected to be completed by July 29, 2022. Question Cuttoff Date & Time 1/5/2023 10:00:00 PM (ET) The extent of electrical work is indicated on drawings and/or specified in Divisions 26 sections of the specification. Provide all labor, materials, equipment, supervision and service necessary for a complete electrical system. Work includes, but is not necessarily limited to, the following items. Existing lighting to be replaced 1 for 1 throughout most spaces. The existing grid structure and light placement is unconventional but will be maintained to minimize clashes above ceiling between existing equipment and new lights, and minimize interruption to the ceiling grid system. 1.2.2 Some instances of existing lights have been removed and will be replaced with a new ceiling tile grid. All existing ceiling devices/elements excluding existing light fixtures are to remain in place. The electrical contractor may remove devices from the ceiling temporarily if required for access but must reinstall any and all existing devices, ceiling grids, wiring, etc that was impacted. 1.2.3 All existing exit signs will be replaced. 1.2.4 Most existing classrooms already have emergency power provided to a light however some spaces require extending the nearest emergency circuit for new emergency lighting within the space. 1.2.5 Existing platform lighting within the gym is to be replaced. 1.2.6 Existing contactor system within the gym to be replaced and new emergency lighting to be introduced. 1.2.7 Work is expected to be completed by August 11, 2023 with substantial completion August 1, 2023. 1. Contractor to refer to specifications and drawings within for additional project requirements. 2. Final product to deliver updated, energy efficient LED lighting with code compliant lighting controls throughout the building. 3. All work must be completed within the 2023 summer break. 4. Contractor must be able to meet and comply with all CSD Terms & Conditions. 5. Company must be able to provide CSD with all bonding requirement. 6. Company must have been in business at least 5 years and performed three (3) similar Scopes Of Work in that time period. Please provide these projects in your Reference information.

Post-Bid

Educational

$40,000.00

Public - County

Renovation

9

12

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
77
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

February 10, 2023

Project location map

3050 Bengal Blvd, Cottonwood Heights, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.