BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 30, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in San Diego, California. Design plans call for site work for a water / sewer project.

Morena Pipeline Project Identification Number S16027 (Water Asset) Build a new 36-inch (approximately 3.15 miles) and the existing Morena Pipeline (approx. 2.74 miles), will be replaced with a new 16-inch pipeline and will serve only as a distribution pipeline. Per the owner, as of November 30, 2022, a design team has been selected. Owner states that the project is anticipated to advertise for bids in January/February of 2023 and construction is anticipated to begin in August 2023.

Design

Water / Sewer

$33,444,875.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
89
Bidding Soon
1,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

Project location map

To Be Determined, San Diego, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.