Site work and paving for a civil project in San Diego, California. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Project Location-Specific: The project is located within the Clairemont Mesa Community Planning Group (Council Districts 2 and 6) along portions of the following streets: Carson Street, Cody Street, Boone Street, Zed Street, Chippewa Court, Clairmont Drive, Dalles Avenue, Dalles Court, Emet Court, Datcho Drive, Fox Avenue, Epanow Avenue, Ecochee Avenue, and Gros Ventre Avenue. Bid Valid 120 Calendar Days Liquidated Damages $1,000 Per Day Estimated Bid Value $17,800,000.00 Start/Delivery Date Project Duration 320 Working Days 1. SLBE participation 8.4% 2. ELBE participation 13.9% 3. Total mandatory participation 22.3% Pre-Bid Meeting No Online Q&A No SCOPE OF WORK: 2.1. The Work and Services required of the Design-Builder include those during design and construction of the Project. The Design-Builder shall provide all management, supervision, labor, services, equipment, tools, supplies, temporary facilities, and any other item of every kind and description required for the complete design and construction of the Project. 2.2. The Design-Builder shall be responsible for performing and completing, and for causing all Sub-consultants/Subcontractors to perform and complete the design and construction of the Project as set forth in the Contract Documents. 2.3. The Design-Builder shall provide all Work and Services required by the Contract Documents, including those described as "if required," "if directed," "potential," "optional," "may," or similar adjectives and phrases. This work falls under the appropriate proposal items. 2.4. The Design-Builder covenants that the Services shall meet the performance expectations of the City as described in this Scope. The Design-Builder shall be responsible for achieving Completion of the Project as set forth in the Project Schedule, as the same may be extended from time to time pursuant to the provisions of the Contract. 2.5. The submission of a Proposal shall be conclusive evidence that the Design- Builder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and scope of Work, the quantities of materials to be furnished, the local conditions under which the Work is to be performed, and as to the requirements of the Proposal Documents, Plans, and Specifications. 2.6. As the Engineer of Work, the Design-Builder shall refer to the City's preliminary design information for the purpose of preparing a set of Plans and Specifications for the construction. 2.7. The Scope of Work and Services [Scope] shall also include but is not limited to the following: Conducting investigations, as-built research, and additional design survey services including physical and aerial surveys if needed for the completion of design work; 1. Conducting investigations, as-built research, and additional design survey services including physical and aerial surveys if needed for the completion of design work; 2. Preparing & completing 30%, 60%, 100%, and Final design drawings. The Design-Builder is solely responsible for the preparation and completion of design plans for construction; 3. Obtaining all City and external agencies plan check approvals; and providing engineering services during construction, startup, and testing; 4. Construction of sewer and water mains and appurtenances including all highlining, cut and plug and cut ins; 5. Monitoring for potential of any hazardous materials and coordination with local resource agencies; 6. Value engineering; 7. Additional geotechnical investigation and potholing; 8. Performance and implementation of QA/QC, 9. Landscaping and re-vegetation plan, if required; 10. Traffic control, paving, AC overlay or Slurry Seal for all streets, storm water permitting and compliance, current ADA Compliance on all curb/ped ramps. 11. Coordinating with the City Project and Construction Managers and other utility owners/contractors; Coordinate utility relocations with utility owners; and, 12. Scheduling, community outreach and public relations, and preparation of asbuilt drawings and mylars. 13. The Design-Builder shall use MicroStation in compliance with the City's "Consultant Standards for Preparation of PS&E." 14. The Design-Builder shall use the Primavera Project Management and Scheduling Software or equal. The Design-Builder shall submit and maintain a task-oriented computerized schedule for completing the Work

Post-Bid

Roads / Highways

$17,800,000.00

Public - City

Paving, Site Work

5

5

6

5

Subscribe For Documents

107 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

March 24, 2023

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.