Published April 7, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Iuka, Illinois. Completed plans call for the renovation of a educational facility.

Works consists of boiler and unit ventilator replacements and all associated work. Bids will be based on a single lump sum general construction contract. Bids shall include not less than the prevailing hourly wage rate determined by the Illinois Department of Labor. Contract documents may be obtained electronically from the office of FGM Architects, 475 Regency Park, Suite 325, O'Fallon, Illinois 62269. Contact Angela McGovern, telephone number 618.624.3364, ext. 1601, email angelamcgovern@fgmarchitects.com. Bid Security is required in the amount of ten (10) percent of Proposal. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. Within ten (10) days after notification of award of contract, the successful Contractor shall furnish a Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner. The Performance Bond shall be in the amount of 100 percent of the accepted bid. The performance bond will become a part of the contract. Failure of the successful bidder to enter into contract and supply the required bonds and Certificate of Insurance within ten (10) days after the prescribed forms are presented for signature or within such extended period as the Owner may grant shall constitute a default. All bids submitted shall be valid for a period of at least sixty days from bid opening; the only alterations which will be allowed will be those approved by the Owner. Owner reserves the right to reject any or all proposals, to waive informalities in bidding, and to award a Contract for any part of the Work or the Project as a whole.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
31
Bidding Soon
404
All Active Projects
191
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

img_map_placeholder

405 N Main St, Iuka, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elementary Boiler Replace CA

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.