BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Templeton, Pennsylvania. Completed plans call for the renovation of a military facility.

Allegheny River L/D 8, Replace Operations Building Roofs. The project is located at 1107 State Route 1033, Templeton, PA 16259-2209. The main roof is approximately 65 feet by 23 feet, or 1495 square feet, and shall be replaced with EPDM sheeting. The small peaked wooden Penthouse roof, 9 feet by 9 feet which shall be completely removed and replaced with new wood, and asphalt shingles. The general description of the work pertains to the following tasks: Asbestos Remediation Contractor will remove asbestos containing materials on roof in accordance with local regulations and law. Operations Building Remove the existing roofing materials (ACM-Asbestos Containing Material), insulation (non-ACM), roof drain covers, and gravel from the operations building. Install a new, fully adhered, 90 mil EPDM roofing system, conforming to ASTM D4637/D4637M. The roofing system shall have new tapered insulation with R-Value of at least 30, in accordance with (IAW) ASHRAE 90.1-2019, and include the addition of any saddles, crickets, curbs, or other features to ensure positive drainage to the roof drains. Placement of insulation will accommodate roof expansion and the strategy for this accommodation will be documented in the roof plan. New flashing shall be installed on remaining protrusions and the parapet. Inspect and repair the drains and install new roof drain covers. The new drain inserts will replace existing roof drains. Operations Building, Cupola Roof Remove the existing roofing to include materials, electrical, and protrusions in accordance with the instructions/ pictures below. Contractor shall install a new wood frame and sheathing with a shingle roof system as specified in Spec Attachment 1-Reference Drawings-AR8 Powerhouse.pdf and manufacturers instructions. Contractor will add drip edge to cupola roof. Contractor shall note in the roofing plan, the new flashing that is to be installed between the chimney and cupola. Reroute Communications Thru Cupola Roof In order to protect and secure communication equipment, Contractor will install a shelf inside the cupola to hold the telecommunications equipment installed on the cupola roof. Relocate the telecommunications line to ingress through the cupola wall. Contractor will protect the telecommunication line transition into the facility with a 2 Stainless Steel Electrical Metal Tubing (EMT). Seal 2 EMT from the weather using a conduit seal or other approved sealant. Contractor shall outline the plan for rerouting the telecommunications equipment and wiring in the roof plan. Chimney Contractor shall inspect the chimney for bats and other pests prior to installing the chimney cap. All animals will be removed prior to install. Contractor shall cap the chimney and flash the chimney ledge in accordance with the manufacturers instructions and the pictures below. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W911WN22Q8001' to obtain more details.* The estimated cost of the proposed work is between $100,000 and $250,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$250,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
135
Bidding Soon
1,503
All Active Projects
661
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2022

May 20, 2022

img_map_placeholder

1107 State Rte 1033, Templeton, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.