BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Dayton, Minnesota. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

Project Category Code: Parks, Recreation, Trail Work, Landscaping (Tree and Shrub Clearing), Paving - Concrete, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Tree Cutting, Aggregate, Buildings and Grounds/Athletic/Sports Facilities, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Grade and Surface, Landscaping, Excavation, Street/Road Materials, Landscaping - Seeding, Stormwater Improvements, Paving (Asphalt or Concrete), Landscaping (Retaining Walls), Pedestrian Improvements, Paving (Trail Paving), Curbs, Furniture, Fixtures, Equipment, Grubbing & Clearing, Bridges/Overpasses The bids received will be publicly opened and read aloud, for the furnishing of all labor and material for the construction of the three different projects included in the 2022 Dayton Parks Improvement Package. Major components of the work include: #1. Donahue Dells Neighborhood Park 1. Earthwork and final grading 2. Concrete patio and pedestrian walkways 3. Limestone seat blocks 4. Concrete playground curbing 5. Site furnishings 6. Landscape planting including perennials and lawn seeding #2. Hayden Hills Neighborhood Park 1. Earthwork and final grading 2. Basketball court surfacing 3. Chainlink backstop and aglime surfacing 4. Park shelter 5. Playground areas 6. Asphalt trails 7. Double pickleball courts 8. Synthetic golf chipping and putting feature 9. Landscape planting including trees, shrubs, and lawn seeding #3. Elsie Stephens Special Use Park - Phase II 1. Earthwork and final grading 2. Gravel and/or paved trails 3. Gravel and/or paved roadways 4. Concrete curbing 5. Pedestrian bridges and concrete abutments 6. Site furnishings 7. Landscape planting including trees, shrubs, and lawn/native seeding Work shall begin after June 6th, 2022 and be substantially completed by November 30th, 2022.

Bid Results

Playgrounds / Parks / Athletic Fields

$242,360.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
773
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

June 6, 2022

img_map_placeholder

Multiple Locations, Dayton, MN

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.