Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published June 15, 2022 at 8:00 PM
Updated September 14, 2023
Site work, paving and new construction of a mixed-use development in Dayton, Minnesota. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.
Project Category Code: Parks, Recreation, Trail Work, Landscaping (Tree and Shrub Clearing), Paving - Concrete, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Tree Cutting, Aggregate, Buildings and Grounds/Athletic/Sports Facilities, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Grade and Surface, Landscaping, Excavation, Street/Road Materials, Landscaping - Seeding, Stormwater Improvements, Paving (Asphalt or Concrete), Landscaping (Retaining Walls), Pedestrian Improvements, Paving (Trail Paving), Curbs, Furniture, Fixtures, Equipment, Grubbing & Clearing, Bridges/Overpasses The bids received will be publicly opened and read aloud, for the furnishing of all labor and material for the construction of the three different projects included in the 2022 Dayton Parks Improvement Package. Major components of the work include: #1. Donahue Dells Neighborhood Park 1. Earthwork and final grading 2. Concrete patio and pedestrian walkways 3. Limestone seat blocks 4. Concrete playground curbing 5. Site furnishings 6. Landscape planting including perennials and lawn seeding #2. Hayden Hills Neighborhood Park 1. Earthwork and final grading 2. Basketball court surfacing 3. Chainlink backstop and aglime surfacing 4. Park shelter 5. Playground areas 6. Asphalt trails 7. Double pickleball courts 8. Synthetic golf chipping and putting feature 9. Landscape planting including trees, shrubs, and lawn seeding #3. Elsie Stephens Special Use Park - Phase II 1. Earthwork and final grading 2. Gravel and/or paved trails 3. Gravel and/or paved roadways 4. Concrete curbing 5. Pedestrian bridges and concrete abutments 6. Site furnishings 7. Landscape planting including trees, shrubs, and lawn/native seeding Work shall begin after June 6th, 2022 and be substantially completed by November 30th, 2022.
Bid Results
Playgrounds / Parks / Athletic Fields
$242,360.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 28, 2022
June 6, 2022
Multiple Locations, Dayton, MN
Related To This Project
Dayton, MN
--
Dayton, MN
Bid Date: Apr 29 2020
Dayton, MN
Bid Date: Jul 14 2022
Dayton, MN
--
Dayton, MN
Bid Date: Jun 09 2022
Dayton, MN
Bid Date: Apr 14 2022
Worthington, MN
Bid Date: Mar 29 2022
Saint Peter, MN
Bid Date: Jun 07 2022
New Brighton, MN
Bid Date: Apr 07 2022
Deerwood, MN
Bid Date: Apr 12 2022
Saint Paul, MN
Bid Date: Jun 16 2022
Waconia, MN
Bid Date: Jun 14 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed