BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Salt Lake City, Utah. Working plans call for the renovation of a municipal facility; for site work for a municipal facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information Amendment 04 Posted 6/13/2022 The Purpose of This Amendment Is to Cancel Solicitation 1240lt22r0034 in Its Entirety. No Award Will Be Made on This Solicitation. Proposals Received in Response to the Solicitation Were Significantly Higher Than the Government Estimate and Exceeded the Appropriations Available to Complete the Project. It Is in the Government's Best Interest to Cancel the Solicitation. Proposals are being solicited by the USDA, Forest Service for the Salt Lake District Office Improvements - Phase 2 project for the Uinta-Wasatch-Cache National Forest. This project will consist of remodeling two existing facilities for the Salt Lake Ranger District Office. Construction includes, but is not limited to, demolition of east entrance stairs of the north building including roof, concrete and steel stairs, doors, brick veneer, lights, mailboxes, railings, landscaping, sidewalks and sod. Excavate and construct new east entry addition including concrete footings, foundations, slabs, helical piers, framing, wood accent entrance, furring, sheathing, roofing, windows, doors, hardware, face brick, composite siding, flashing, insulation, gypsum board, painting, wood stairs, railings, doors, hardware, knoxbox, ceramic tile, grilles, tongue and groove ceiling, hydraulic elevator, sump pump oil detector, ductwork, electrical service, security, fire alarm, lighting and communications. Backfill and regrade at the addition. Demolish existing finishes, walls, doors, hardware, concrete slab, cabinetry, stairs, ceilings, plumbing, HVAC equipment, ductwork, lights, electrical and communication improvements. Provide and install new wood framing, wood stairs, railings, gypsum board, ceramic tile, vinyl tile, base, carpet, casework, insulation, doors, frames, hardware, interior windows, painting, staining, finish carpentry, cabinetry, ceilings, TPO, insulation, roofing, toilets, sinks, plumbing, drinking fountains, heating and cooling equipment, fans, ductwork, registers, lights, sensors, power and communications. The solicitation is set-aside for small businesses. This solicitation is anticipated to be issued on or after April 15, 2022. The anticipated start date is August 2022. The contract time will be 360 calendar days for the north building and 180 calendar days for the south building. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is FREE. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a FREE resource to all small business and your state representative's contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. Vendors are required to be registered in the System for Award Management (SAM). The method of contractor selection has not been determined at this time. All questions regarding the solicitation were to be submitted no later than 1:00pm MT, Tuesday, May 10, 2022. Any questions submitted after this date may not be addressed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Municipal

$5,000,000.00

Public - Federal

Paving, Renovation, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
33
Bidding Soon
523
All Active Projects
245
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2022

August 5, 2022

img_map_placeholder

6944 S 3000 E, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.