BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Falls Church, Virginia. Completed plans call for the renovation of a educational facility.

FCCPS is replacing HVAC rooftop units at Mary Ellen Henderson Middle School (MEHMS). The selected contractor(s) will be required to perform the following tasks, including but not limited to: 1. Removal and disposal of the existing 12 rooftop HVAC units 2. Installation of 12 new, replacement HVAC rooftop HVAC units 3. Connection of system into our existing DDC controls 4. Start up and testing of equipment 5. Following is a chart that details the technical specifications for the existing rooftop units that are to be replaced: The City intends to have this project completed by August 19, 2022.

Bid Results

Educational

$1,639,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
425
Active Projects
210
Bidding Soon
2,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

Project location map

7130 Leesburg Pike, Falls Church, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.