BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Copan, Oklahoma. Completed plans call for site work for a bridge / tunnel; water / sewer project; road / highway; and for paving for a road / highway.

Award Details Contract Award Date: Oct 28, 2022 Contract Award Number: W912BV22C0026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: M8K2L9NG6PB8 Contractor Awarded Name: RK EXCAVATION, L.L.C. Contractor Awarded Address: Bloomsdale, MO 63627-8966 USA Base and All Options Value (Total Contract Value): $3182099.50 Copan Toe Drain Replacement - Copan Lake, Washington County, Oklahoma This is a competitive solicitation for a firm-fixed price contract to be aw arded under the best value continuum using the tradeoff process in accordance w ith Federal Acquisition Regulation (FAR) 15.101-1. The contracting officer intends to aw ard a firm-fixed price contract to the responsible offeror w hose proposal conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering the non-price factors described in the solicitation, and price. The NAICS code for this project is 237990 - Other Heavy and Civil Engineering Construction. The size standard is $39.5M. In accordance w ith FAR PART 36 and Defense Federal Acquisition Regulation Supplement (DFARS) PART 236, the cost magnitude of this project is betw een $1,000,000 and $5,000,000. Copan Toe Drain Replacement, Copan Lake, Copan, Oklahoma. This project is a Total Small Business set-aside, firm-fixed price, construction contract procured in accordance with Federal Acquisition Regulation (FAR) Part15, Contracting by Negotiation utilizing the Tradeoff process. The work includes replacement of the toe drain system, removal, and replacement of road culverts on the Copan dam toe road and all incidental related work. This includes new pipes, sand and gravel filter, and manholes. This also requires the removal of the existing relief well collection system and laterals to relief wells. All relief wells and other instruments must be protected during removal and connected to the new relief well drain line. Any damages to the existing asphalt and gravel roads must be repaired. *Amendment 0001 - This amendment incorporates site visit information, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912BV22R0032' to obtain more details.* *Amendment 0002 - This amendment incorporatesa revised section 00 22 11, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912BV22R0032' to obtain more details.* *Amendment 0003 - This amendment updates the Wage Determination, please see Attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912BV22R0032' to obtain more details.* *Amendment 0004 - This amendment extends the date that proposals are due for this requirement and provides a picture of the disposal area, please see attachments for full details. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtmlsolNo=W912BV22R0032' to obtain more details.* *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$3,182,099.00

Public - Federal

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
35
Bidding Soon
608
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2022

October 6, 2022

img_map_placeholder

Copan dam toe road, Copan, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.