BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sauk Village, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Public Notice The Village of Steger is accepting proposals from consultants for Phase I and Phase II engineering design of improvements along Sauk Trail (FAU 1632) and Cottage Grove Avenue (FAU 2920) from State Street to Steger Road (FAU 1635). The evaluation criteria and weighting for this project is as follows: technical approach (20%), firm experience (20%), staff capabilities (20%), past performance (15%), workload capacity (15%), and local presence (10%). Consultants should request a proposal packet from the Village. The packet contains a detailed description of the project, conflict of interest forms, and specific requirements for the format and content of their submission. Proposal responses are due April 20, 2022, at 2:00pm at Village Hall, 3320 Lewis Avenue, Steger, IL 60475. The technical proposal must not contain any cost information. All proposals shall include a conflict of interest form. Proposals will be evaluated and at least three consultants will be selected and ranked based on their qualifications, approach to the project, and ability to furnish the required services. 4/1/2022, 4/8/2022 7182316

Conceptual

Roads / Highways

$280,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
326
Active Projects
189
Bidding Soon
2,930
All Active Projects
1,243
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 20, 2022

img_map_placeholder

Cottage Grove Ave & E Sauk Trail, Sauk Village, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.