BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Lincolnton, Georgia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

24" cross drain and junction box reconstruction at the intersection of North Peachtree and Goshen Street - 1. Saw and remove existing asphalt 2. Install 24" RCP 3. Connect to existing storm manhole, install stone bedding and select backfill as needed for storm pipe. 4. Remove/replace existing concrete sidewalk, curb and gutter required to install new 24" storm pipe. 5. Patch over 24" storm pipe with 6" of concrete. Bring concrete within 2" of existing road grade. 6. Clean, tack and install 2" of 12.5 MM of asphalt of 6" concrete patch.

Award

Water / Sewer

$51,587.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
0
Bidding Soon
444
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2022

July 1, 2022

Project location map

N Peachtree St & Goshen St, Lincolnton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.