BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work for a water / sewer project in San Gabriel, California. Completed plans call for site work for a water / sewer project.

This project will replace 2,245 linear feet of 18-inch sewer pipeline on Dewey Avenue with new 21-inch pipe to improve capacity. This project will also rehabilitate 300 linear feet of damaged 8-inch sewer pipeline on Brighton Street with cured-in-place liner. (Reference Sewer Master Plan Table 5-13) The project is included in the City of San Gabriel's FY 2021-2022 Capital Improvement Program (CIP). Per the owner, as of October 29, 2025, the construction will be awarded on November 4, 2025, a contractor has been named. It is anticipated that the construction will begin in late December 2025, or early in January 2026.

Award

Water / Sewer

$1,388,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
252
Bidding Soon
3,855
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2025

Project location map

Multiple Locations, San Gabriel, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.