BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Flagstaff, Arizona. Contact the soliciting agency for additional information.

Project Name: Switzer Canyon Dr - Steve Blvd Project (TRACS) Number: 040B CN 197 M5195 01X District: Northcentral (NC) Route/MP: 040B / 197 Funding Source: M5195 01X Construction Funding FY: N/A The project is located on SR 40B (old US 66) in the City of Flagstaff, from approx.. MP 197 to MP 199. Due to periodic R/W and encroachment issues raised by the Northcentral District, recent R/W donations in this area, and that the current R/W plans have some errors in the depiction of the existing R/W, a R/W documentation survey has been requested by the District and R/W Mgmt. The initial scope task is anticipated to be for a Right of Way Survey. R/W Survey: The selected Consultant will prepare an ADOT standard R/W survey and Results of Survey drawing for this project. The west end of the survey will tie into and overlap the recently completed R/W Survey for project 040B CN 196 H8905 at the N-S midsection line of Sec. 22, T21N-R7E. The east end of the survey will tie into and overlap the R/W survey completed in 2009 for R/W project 040B CN 199 H7223 01R at the north line of Section 13, T21N-R7E. The R/W survey and Results of Survey will supplement/supersede the current R/W plans M-951-6-801 for the length of the new survey. Funding for this project is anticipated to be in place in July 2022. Anticipated first submittal date of the Results of Survey : Jan.30, 2023. As the project progresses, it is anticipated that an additional scope task that may be requested on this project will be Monument Existing Right of Way Questions, in writing, shall be received by ECS at the below email address until April 07, 2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified This project is to construct a case III multi-lane roundabout at SR 69/SR 169 to replace an existing traffic signal in the Town of Dewey Humboldt. The scope of work include project administration, supplemental survey, environmental clearance tasks, ROW coordination, Utilities relocation coordination and UA draft agreement preparation, engineering design, stakeholder coordination, scoping, engineering design - all PS&E packages to bid (Stages II, III, IV , & V are expected). The method of contractor selection has not been determined at this time. AZ DOT - RFQ Project Development On-Call - Switzer Canyon Dr - Steve Blvd

Conceptual

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
72
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2022

img_map_placeholder

SR 40B, Flagstaff, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.