BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

Scope of Work: The Parks & Recreation Department of the City of Santa Cruz is soliciting proposals for the Decking and Railing Rehabilitation on the Floating Walkway/Dock at Neary Lagoon. The project is needed to ensure safe pedestrian access across Neary Lagoon. It involves removing and replacing 440 linear feet of deteriorating Alaskan yellow cedar planks and railing on the pathway which crosses the lagoon with a durable, composite material, such as Trex decking but with a similar weight and density as that of the original Alaskan yellow cedar. Maintenance to the existing floating substructures is not requested as part of this solicitation. In general, the work to be done consists of removal of benches and signage, removal of the existing and degraded 440 linear feet of Alaskan cedar dock surface and rails, transport of Alaskan cedar for disposal, installation (in kind) of a durable, composite dock and rail material, reinstallation of benches and four new interpretive signs, site cleanup and completion of a project summary report. The contract will be awarded on an all or nothing basis and is tentatively scheduled to begin August 1, 2022 and must conclude by October 1, 2022. Project staging in advance of the August 1st date is a possibility and should be outlined in bid responses if so desired.

Post-Bid

Water / Sewer

$80,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

August 4, 2022

img_map_placeholder

To Be Determined, Santa Cruz, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.