BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 4, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and new construction of a mixed-use development in New Richmond, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for the construction of a pre-engineered storage facility; and pre-engineered storage facility.

Installation of a pre-fabricated restroom and associated water and sewer lines. Installation of air/vacuum valves and flushing stations on an existing low pressure sewer system. Asphalt paving of approximately 600-feet of roadway. Est. Completion Date: Dec. 2, 2022

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$470,000.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
121
Bidding Soon
1,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

Project location map

Multiple Locations, New Richmond, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.