BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bonne Terre, Missouri. Completed plans call for the renovation of a educational facility.

North County Intermediate & High School MEP Upgrades Summer 2022 North St. Francois County R-1 School District Project No. 20-105E SECTION 00 01 13 On behalf of the North St. Francois County R-1 School District, Brockmiller Construction, Inc., the Construction Manager, will receive Bids for the North County Multiple Facility MEP Upgrade Projects to be performed at the Intermediate School and High School, and Shower Upgrade Project at the Middle School located in Bonne Terre and Desloge, Missouri. Associated Bid Packages are as follows: Bid Package #1 Mechanical Bid Package #2 Electrical Bid Package #3 Plumbing Bid Package #4 General Trades Bids must be on a Lump Sum basis. If bids are to be submitted prior to the bid opening time (via mail or early delivery), please send directly to the North St. Francois County R-1 School District located at 300 Berry Road, Bonne Terre, Missouri 63628, Attention: Mrs. Kathryn Bockman, Superintendent. Proposals received after this time will not be accepted. Bidding Documents will be available after Monday, March 28, 2022 through Brockmiller Construction At the Construction Manager s discretion, the bond amount may be added to the successful Bidders' contract amount. All Bidders are subject to and must comply with applicable state and federal anti-discrimination laws. All Contractors and Subcontractors shall conform to the most current State of Missouri, Division of Labor Standards, St. Francois County, Wage Order in accordance with Section 290.262 CUM. Supp. RSMo (1994). All Contractors and Subcontractors shall conform to the Missouri Prevailing Wage Law Sections 290.550 to 290.580 Public Works During Excessive Unemployment, if such provision applies to this Project. The Owner reserves the right to reject any or all Bids and to waive informalities or irregularities in the bidding. Bids will be reviewed by the School District, the Construction Manager and Design Consultants following the reading of bids. No bids shall be withdrawn after the receiving of bids, without consent of the Board of Education, for a period of sixty (60) days after the schedule time of closing proposals.

Post-Bid

Educational

$91,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
34
Bidding Soon
769
All Active Projects
290
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2022

May 13, 2022

img_map_placeholder

Multiple Locations, Bonne Terre, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.