BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 20, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Burnaby, British Columbia. Completed plans call for site work for a bridge / tunnel.

This Contract consists of an outfall extension for Byrne Creek at Hedley Avenue. The outfall extension project includes clearing and grubbing, tree removal, removal of unsuitable material, import and placement of approximately 1,190 tonnes of embankment fill, installation of approximately 48m of HDPE storm sewer with pipe anchors, storm manhole, impact baffle outlet structure, rip rap, landscaping, and associated Works. Erosion and sediment control plans, dewatering, flow diversion, and Environmental Monitoring are a requirement for the duration of the Work. Documents can be obtained from www.bcbid.gov.bc.ca.

Award

Water / Sewer

$976,682.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
60
Bidding Soon
2,488
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

May 23, 2022

Project location map

Hedley Ave, Burnaby, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.