BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Omak, Washington. Completed plans call for site work for a water / sewer project.

** This project has been awarded to JR Construction in the amount of $2,352,692. ** ENGINEER'S ESTIMATE $2,800,000 to $3,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. FOR BID QUESTIONS CONTACT Dave Ellis, P.E. dellis@g-o.com The work consists of furnishing all material, labor, tools, equipment, and incidentals necessary for construction of the 2022 Sewer and Water System Improvements project. Work will be performed within City owned rights-of-way, permanent easements, and on private property where temporary construction easements and/or rights-of-entry have been obtained for construction. The work consists of, but is not limited to, the following: Schedule A - Sewer System Improvements 1. Furnish and install approximately 3,262 feet of 8-inch and 12-inch HDPE sanitary sewer pipe and 4,000 feet of 4-inch HDPE side sewer pipe by pipe bursting construction. 2. Furnish and install approximately 529 feet of 8-inch PVC sanitary sewer pipe and 400 feet of 4-inch PVC side sewer pipe. 3. Furnish and install 14 manholes and approximately 38 side sewer cleanouts. 4. Provide television inspection of sewer mains and side sewers. 5. Reconnection of approximately 65 side sewers. 6. Surface restoration of all disturbed surfaces. Schedule B - Hemlock Street Water System Improvements 1. Furnish and install approximately 310 feet of 8-inch DI water main, 50 feet of 1-inch HDPE water service pipe, three gate valves, fittings and appurtenances. 2. Surface restoration of all disturbed surfaces. Schedule C - Dewberry Avenue Water System Improvements 1. Furnish and install approximately 740 feet of 8-inch DI water main, 550 feet of 1-inch HDPE water service pipe, three gate valves, one pressure reducing valve vault, one fire hydrant assembly, fittings and appurtenances. 2. Surface restoration of all disturbed surfaces

Award

Water / Sewer

$2,352,692.00

Public - City

Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
8
Bidding Soon
235
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

June 20, 2022

Project location map

Multiple Locations, Omak, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.