Renovation of a water / sewer project in Woodstock, Illinois. Completed plans call for the renovation of a water / sewer project.
This project shall consist of the removal of accumulated wastewater biosolids in two (2) wastewater treatment cells, the removal of two (2) existing wastewater treatment cell liners, and replacement with two (2) new wastewater treatment cell liners. The Contractor shall be responsible for material inspection required for various items incorporated in this project. Also, all documentation is to be submitted to the Engineer, immediately following completion of this project. Five percent (5%) of the final contract amount due the Contractor will be withheld pending receipt of said documentation. The Contractor shall schedule their work to have all liner replacement and site restoration work completed by November 18th, 2022. Both cells cannot be taken out of service at the same time; the Contractor shall plan their work accordingly so that only one (1) cell is out of service at any given time. Failure by the Contractor to complete the work within this time frame may result in the assessment of liquidated damages. This date is subject to change if an agreement in writing is reached between the Owner and the Contractor. The Contractor shall furnish all materials, tools, equipment, and labor necessary for the removal and replacement of two (2) wastewater treatment system cell liners. The County of McHenry owns and operates a wastewater reclamation and reuse system which include two (2) wastewater treatment cells. The existing treatment cell liners are beyond their useful life and need to be replaced. The work shall include removal of the two (2) existing cell liners and replacing with new. (Refer to FIGURE 1-1 for a Process Flow Diagram.) B. Project Overview: 1. Cell #1 has an approximate holding capacity of 1,027,100-gallons and the liner covers an area of approximately 29,000 ft2. The cell shall be emptied and accumulated wastewater biosolids removed and properly disposed of. The existing liner shall be removed and properly disposed of, and a new liner shall be installed. The approved liner material is reinforced polypropylene geomembrane with a minimum thickness of 45 mils. 2. Cell #2 has an approximate holding capacity of 5,261,000-gallons and the liner covers an area of approximately 104,000 ft2. The cell shall be emptied and accumulated wastewater biosolids removed and properly disposed of. The existing liner shall be removed and properly disposed of, and a new liner shall be installed. The approved liner material is reinforced polypropylene geomembrane with a minimum thickness of 45 mils. 3. The Contractor shall field verify all dimensions. (Refer to FIGURE 1-2 for the Treatment Site Cross Section and FIGURE 1-3 for the Treatment Site Plan.) May 19, 2022 Vendor Questions Answered via Addendum No Later than 4:00PM CST
Post-Bid
Water / Sewer
$700,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2022
June 27, 2022
To Be Determined, Woodstock, IL
Related To This Project
Woodstock, IL
Bid Date: Apr 07 2022
Woodstock, IL
Bid Date: Apr 07 2022
Woodstock, IL
Bid Date: Apr 29 2022
Woodstock, IL
Bid Date: Jun 15 2022
Woodstock, IL
Bid Date: Jul 19 2022
Woodstock, IL
--
Woodstock, IL
Bid Date: Jun 10 2022
Woodstock, IL
Bid Date: May 20 2022
Woodstock, IL
Bid Date: Apr 06 2022
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
--
Woodstock, IL
Bid Date: May 06 2022
Woodstock, IL
Bid Date: Mar 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.