BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Woodstock, Illinois. Completed plans call for site work for a playground / park / athletic field.

This work shall generally include all labor, equipment and materials necessary to remove the old surface and base, prepare site, install new base, lay new asphalt, seal, stripe one basketball court, and restoration of alldisturbed areas and backfilling the edges of the recently replaced court at Mary Anne Park. Replacement of basketball court to include: removal, install new base, prepare site, lay new asphalt, seal, and striping for one individual basketball courts Basketball hoops should remain in place during project. It is up to the discretion of the contractor to determine whether or not to remove the hoops. Should the contractor decide to remove the hoops, it is the contractor's responsibility to replace them at regulation height and offsets at no cost to the City of Woodstock. . Full removal of all asphalt materials and base materials from one basketball court totaling approximately 7,350 Sq. Ft. Each court measures 105 Ft. x 70 Ft. . Compaction and inspection of subgrade material prior to placement of CA-6 aggregate base. Any wet / soft spots in the sub grade prior to the placement of the CA-6 aggregate base shall be undercut and replaced with filter fabric and 3" open graded stone base. This work shall be incidental to the contract. . Installation of 8" thick minimum compacted CA-6 aggregate base. . Paved base course layer installation depth of 2-1/2" of Illinois Class I Bituminous Concrete surface and roll to an approximate compacted depth of 2 . Paved finish layer installation depth of 2" of Illinois Class I Bituminous Concrete Asphalt and roll to an approximate compacted depth of 1-1/2" . Asphalt Court Surface Finishing details shall include the following: . Two (2) Sand sealer applications over entire asphalt surface per court . Two (2) Coats of Nova Stadium Blue acrylic paint (or equal quality paint) per court . Stripe white boundary lines for individual court . Two (2) Free throw arch keys per court . Two (2) Three-point lines per court . One (1) Center line with center circle . Restoration of all disturbed areas and backfilling the edges of the recently replaced courts shall include pulverized black dirt, seed and blanket. Award of the bid will be considered at a later meeting of the Woodstock City Council within at least thirty (30) days of the date of receiving bids. All bids received prior to the specified date and time, which meet or exceed the minimum specifications, will be considered by the City. The City will review each properly submitted bid and will select based upon price, availability, quality and other features of the bid proposals. Bids submitted after 10:00 a.m. will not be considered and will be returned to the bidder. The City of Woodstock reserves the right to reject any or all bids, to waive irregularities in the bids, and to select the bid that is considered to be the most advantageous to the City of Woodstock. Only bids and proposals submitted on forms prepared by the City of Woodstock will be considered. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Playgrounds / Parks / Athletic Fields

$79,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
101
Bidding Soon
2,128
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2022

June 20, 2022

img_map_placeholder

730 Mary Ann St, Woodstock, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.