Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Site work and new construction of a water / sewer project in Woodstock, Illinois. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

FY22/23 Project Description One of the City's wells has experienced a reduction in its pumping rate. Therefore, it will be necessary to drill a new well earlier than previously anticipated in the CIP budget, and funds have been moved up approximately three years to start the process of designing a new well and determining the appropriate new location for the well. The cost for drilling this new well are included in the Water & Sewer Capacity budget as it is necessary to add this well to accommodate community growth as well as fix an existing issue with the City's water system related to reduced pumping rates. Funds in FY22/23 are requested to work with an engineering consultant on a new well design and on selecting the most beneficial and appropriate location for the new well. FY23/24 Project Description Funds in the amount of $1,750,000 are requested in FY23/24 to complete project construction, which includes activities such as drilling a new well, installing pump equipment, and providing electrical power. If drilling the new well in close proximity to an existing well is not feasible, costs would increase due to the need to build a pipeline from the well to the nearest treatment facility. This project is included in the City of Woodstock's FY 2024-2034 Budget CIP and funding for construction is allocated for FY24/25-FY33/34. Project is under construction. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Under Construction

Water / Sewer

$2,500,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
543
Active Projects
294
Bidding Soon
3,873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

Project location map

To Be Determined, Woodstock, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.