Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 29, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a sidewalk / parking lot in Woodstock, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work described in these specifications consists of performing Sidewalk Removal and Replacement following the requirements of Section 424 and 440 of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation (IDOT), January 1, 2022, hereafter referred to as the Standard Specifications. The City of Woodstock will receive sealed bids for its 2022 Sidewalk Replacement Program consisting of Sidewalk Removal and Replacement following the requirements of Section 424 and 440 of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation (IDOT), January 1, 2022, hereafter referred to as the Standard Specifications in various areas within City limits until 10:00 am, Friday, July 1, 2022. Award of the bid will be considered at a later meeting of the Woodstock City Council within at least 30 days of the date of receiving bids. Only bids and proposals submitted on forms prepared by the City of Woodstock will be considered. All bids received prior to the specified date and time, which meet or exceed the minimum specifications, will be considered by the City. The City will review each properly submitted bid and will make a selection based upon price, availability, quality and other features of the bid proposals. Not less than the prevailing rates of wages as found by the City of Woodstock and/or the Illinois Department of Labor, or determined by a court on review, shall be paid to all laborers, workmen, and mechanics performing work under this contract. The successful bidder shall comply with all requirements of the Employment of Illinois Workers on Public Works Act, 30 ILCS 570/0.01. The City of Woodstock reserves the right to reject any or all bids, to waive irregularities in the bids, and to select the bid that is considered to be the most advantageous to the City of Woodstock. Completion date – October 31 th , 2022. 100% of the project shall be completed

Award

Sidewalks / Parking Lot

$40,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
658
Active Projects
262
Bidding Soon
4,930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2022

August 1, 2022

Project location map

Multiple Locations, Woodstock, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed