BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in New Bremen, Ohio. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project comprises a 54' x 190' post frame building system structure to be utilized for bus and maintenance equipment storage. Building includes a restroom. Maintenance storage area shall be insulated, all bus parking is cold storage. Site scope shall include, but not limited to, rough grading, concrete aprons, bollards, gravel pavement, and underground utilities. Plumbing Work: The base project includes water, sanitary, and vent systems for the restroom and a service sink, floor drains, and an oil intercepter. The alternate is for five additional trench drains and the associated waste and vent piping. HVAC Work: The project consists of electric unit heaters and exhaust fans in the maintenance storage area and restroom and one air intake louver as shown on the drawings. Electrical Work: The project includes selective demolition of electrical site equipment and devices. In addition, this project will include a new 100A subpanel, receptacles, interior/exterior lighting, technology site conduit and connections to mechanical/plumbing equipment and related work. A Bid Security in the form of a certified check, cashier's check, irrevocable letter of credit, or surety company bond pursuant to Chapter 1305 of the Ohio Revised code in the amount of 10% of the total bid shall accompany each bid; or a bid guaranty bond in accordance with Chapter 153.571 of the Ohio Revised Code in the amount of 100% of the total bid shall accompany each bid. Each bid must be submitted in duplicate on a blank form furnished by the Architect, in a sealed envelope. Mark plainly on the outside of the envelope, the project you are bidding on. No bidder may withdraw their bid for a period of sixty (60) days after the bid opening The Owner reserves the right to reject any or all bids and to waive informalities, irregularities and/or errors in the bids to the extent permitted by law. This includes the right to extend the date and time for receipt of bids. Project No. 22050005WAP

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$430,789.00

Public - City

New Construction, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
45
Bidding Soon
1,064
All Active Projects
519
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 23, 2022

img_map_placeholder

901 E Monroe St, New Bremen, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.