Published June 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Weatherford, Oklahoma. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

**As of June 03, 2022, project was awarded to Altus Sand and Gravel, awarded amount is $1,344,918.44.** EDA No. 08-79-05369 for Water, Sewer, Grading, Paving and Drainage Improvements for Business Technology North Park to wit: Site Development and Paving Improvements Quantity Unit Description 1.00 L.S. SWPPP Documentation and Management 12,000.00 S.Y. Solid Slab Sodding 120,000.00 C.Y. Unclassified Excavation 1,308.93 TONS Asphalt Type S4 - 2" Thick 2,617.86 TONS Asphalt Type S3 - 4" Thick 5,259.10 GAL Prime Coat 3,272.33 GAL Tack Coat 6,692.00 L.F. Concrete Curb & Gutter 13,917.56 L.F. Stabilized Subgrade 394.56 TONS Aggregate Base Type A (6" Thk) Water System Improvements Quantity Unit Description 2911.00 L.F. 12" PVC C900 DR-18 Waterline 5.00 EACH 12" Gate Valve & Box 50.00 L.F. Bore & Install 180" Steel Casing 9.00 EACH 6" Gate Valve & Box 9.00 EACH Fire Hydrant Assembly w/ Riser Pipe 9.00 EACH 12" x 6" Tee 135.00 L.F. 6" PVC C900 DR-18 Waterline Sanitary Sewer System Improvements Quantity Unit Description 1838.00 L.F. 8" SDR 26 Sanitary Sewer Pipe w/ Embedment 10.00 EACH Sewer Manhole w/ Frame and Cover 1837.00 L.F. Trench Excavation & Backfill (0-10') 1.00 L.S. Electrical Service for Lift Station 45.00 L.F. Bore and Install 10" Steel Casing 620.00 L.F. 6" PVC Force Main 4.00 EACH 6" x 45 Bend 1.00 L.S. Lift Station Drainge & Storm Sewer System Improvements Quantity Unit Description 3.00 EACH Concrete End Sections for (1) 48" Storm Sewer Pipes 2.00 EACH Concrete Headwall for Double 73"x45" RCPA Storm Sewer Pipes 1.00 L.S. Culvert End Sections 140.00 L.F. 22"x13" RCPA Storm Pipe 82.00 L.F. 58"x36" RCPA Storm Pipe 124.00 L.F. 73"x45" RCPA Storm Pipe 148.00 L.F. 30" HDPE Pipe Storm Sewer 588.70 L.F. 36" HDPE Pipe Storm Sewer 246.00 L.F. 42" HDPE Pipe Storm Sewer 444.00 L.F. 48" HDPE Pipe Storm Sewer 490.00 L.F. 24" HDPE Pipe Storm Sewer 6.00 EACH Concrete Drop Inlet for 48" Pipe 4.00 EACH Storm Sewer Manhole w/ Frame & Cover 4.00 EACH Junction Box 6.00 EACH Inlet CI Design 3D 5.00 EACH Inlet CI Design 3 STD 50.00 TONS Rip-Rap No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. Bids are solicited and a contract award will be made pursuant to the Public Competitive Bidding Act of 1974 as amended (Title 61, O.S. 1981, Sections 101-136 et seq.) The Owner will award each section to the lowest qualified bidder for said section. The Contractor must not be on government wide exclusions in the Sam.gov debarment/ exclusionary list, otherwise Contractor is declared ineligible for the contract. Buy American Preferences: Strengthening Buy-American Preferences for Infrastructure Project. Recipients of covered programs (as defined in Executive Order 13858, 31 January 2019, and 2 C.F.R. 200.322 (Domestic preferences for procurements) are hereby notified that they are encouraged to use, to the greatest extent practicable, iron and aluminum as well as steel, cement and other manufactured products produced in the United States in every contract, subcontract, purchase order or subaward that is chargeable under this Award. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in the solicitation. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered. Cost estimate $2.5 million to $3 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidder hereby agrees to commence work under this contract on or before a date to be specified in the Notice to Proceed and to fully complete the project within Section A 120 consecutive calendar days, Section B 120 consecutive calendar days, Section C 120 consecutive calendar days and Section D 120 consecutive calendar days . Bidder further agrees to pay $1000.00 as liquidated damages for each consecutive calendar day thereafter completion date specified in the Notice to Proceed.

Award

Roads / Highways

$1,344,918.00

Public - City

Paving, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
33
Bidding Soon
365
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

May 27, 2022

img_map_placeholder

Multiple Locations, Weatherford, OK