BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Edgewater, Florida. Completed plans call for site work for a water / sewer project.

City of Edgewater does not discriminate based on age, race, color, sex, religion, national origin, disability or marital status This is a federally assisted project and is subject to Federal Labor Standards which include, the Davis-Bacon Act (payment of prevailing wage rates) and the Copeland Act (anti-kickback of wages & submission of weekly certified payroll reports), as well as other provisions including 24 CFR 85.36 (bonding requirements), and Section 3 & M/WBE. Laborers and mechanics employed by primary contractors and sub-contractors performing construction work on this project shall be paid wages at rates not less than the prevailing rates as determined by the Secretary of Labor in accordance with the Davis-Bacon Act. The prime contractor is responsible for the enforcement of wage compliance and support documentation for the duration of the project and may be held liable for wage restitution. The applicable information regarding the laws and regulations stated above are included in the bid packet. This project is being funded by the City of Edgewater. The City has received grants for a significant portion of the work, including a Hazard Mitigation Grant Program (HMGP) grant through Florida Division of Emergency Management (FDEM) pertaining to the acquisition and demolition of the repetitively flooded structure at 405 Hart Avenue, and a Community Development Block Grant Disaster Recovery (CDBG-DR) Rebuild Florida Infrastructure Grant through the Florida Department of Economic Opportunity (FDEO) for the construction of drainage improvements within this neighborhood. All work shall be in conformance to the requirements of the HMGP and CDBG-DR grants. Proposers must meet all CDBG/FDEO requirements. This Contract is for the construction of the Hart Avenue Drainage and Water Main Improvements. This project is located just west of US-1 between W Pine Bluff St and W Connecticut Ave., Edgewater Florida. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: Drainage improvements consisting of: installation of approximately 3,300 LF new storm pipe, 34 concrete storm structures, associated utility adjustments, re-grading existing stormwater conveyances and creation of new swales. Also including demolition of an existing flood-prone house and converting the property into a stormwater pond. Storm piping consists of approximately 1,300LF of 12" to 24" diameter piping and approximately 2,000LF of 36" to 48" diameter piping. Water Main improvements consisting of: approximately 3,600LF of 6" C-900 PVC water main, 1,600LF of 2" polytube, directional drill 1,350LF of 6" Fusible PVC C-900 DR, 8 fire hydrants and adjusting utilities accordingly. Gate Valves, Tapping Sleeves, and Insertion Valves will also be installed per plans and specs. Deadline for Questions:April 28, 2022, 2:00pm Evaluations Due./Notice of Recommendation:May 19, 2022 Bid Bond: A copy shall be uploaded with proposal response in the form of a Bid bond, certified funds or an irrevocable letter of credit in a sum equal to the amount of five percent (5%) of the total proposal price. Alternately a, cashiers' check, cash bond can posted with the City Clerk. All checks shall be made payable to the City of Edgewater on a bank or trust company located in the State of Florida and insured by the Federal Deposit Insurance Corporation, as a guarantee that the proposer, if its proposal is accepted, will promptly execute the Agreement. The proposer shall guarantee the total proposal price for a period of 60 days from the date of the proposal opening. Contractor Selection Date:June 6, 2022 To have the ability to submit To have the ability to submit your request for substitutions, the form may be found under the Question and Answer Tab in ProcureNow. Any manufacturers name, brand name, and/or model number information contained in this solicitation is being used for the sole purpose of establishing the minimum requirements of the level of quality, standard of performance, and design, and is not intended to prohibit the offer of another manufacturer's items of equal material and quality. The Contractor shall complete work within One Hundred Fifty (150) days to Substantial Completion, One Hundred Eighty (180) days to Final Completion.

Bid Results

Water / Sewer

$1,948,664.00

Public - City

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
121
Bidding Soon
1,833
All Active Projects
727
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 13, 2022

July 13, 2022

January 9, 2023

img_map_placeholder

Hart Ave, Edgewater, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.