BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2022 at 8:00 PM

Updated September 2, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Middlebury, Indiana. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Town of Middlebury Bristol Avenue Reconstruction from Brown Street to Powell Drive (Des # 2101771) in the Fort Wayne District This Request for Proposals (RFP) is official notification of needed professional services. This RFP is being issued to solicit a letter of Interest (LOI) and other documents from firms qualified to perform engineering work on federal aid projects. A submittal does not guarantee the firm will be contracted to perform any services but only serves notice the firm desires to be considered. Contact for Questions: Mary Cripe, P.E., Town Manager 418 North Main Street Middlebury, IN 46540 574-825-1499 townmanager@middleburyin.com Local Public Agency: Town of Middlebury Project Location: Bristol Avenue from Brown Street to Powell Drive Project Description: The Bristol Avenue Reconstruction includes a 0.66-mile section of Bristol Avenue (CR 8) from Brown Street to Powell Drive. The scope of the work includes reconstruction of the 2-lane roadway, curb and gutter, storm sewer, multi-use path construction, and replacement of impacted Town utilities that include sanitary sewer, lift station and water main. In addition, the project will include sight-line improvements at intersections and along the roadway, evaluation of intersection controls, and turn lanes on Hemsbred Street. The proposed multi-use path connects to the Pumpkinvine Nature Trail and will be the first section of the Quaker Trace Trail system to connect our residential subdivisions along the corridor and allows for future extension to connect Middlebury to Bonneyville Mill Park and eventually to the Town of Bristol. INDOT Des #: 2101771 Phases Included: PE and ROW Estimated Construction Amount: 5,256,420 Funding: 80% Federal Funding Term of Contract: Until Project Completion DBE goal: 7% The method of contractor selection has not been determined at this time. INDOT - RFP Engineering - Bristol Avenue Reconstruction

Conceptual

Bridges / Tunnels

$5,256,420.00

Public - City

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
159
Bidding Soon
1,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

Project location map

Bristol Ave, Middlebury, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.