Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 20, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a road / highway in Detroit, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of work is to reconstruct Devine Avenue. from French Road to Athens Avenue and reconstruct Athens Avenue from Devine Avenue to Harper Road. The work includes, but is not limited to, removal of approx. 8,800 syds of existing asphalt pavement, installation of approx. 1,200 ft of combined sewer (12" to 15"), installation of 21 ea. drainage structures (12" to 72"), and construction of approx. 7,700 syds of concrete pavement, 10" and 28,600 sft of concrete sidewalk (4" to 8"). The work will be divided into two phases and will require coordination with Conrail for construction at the railroad crossing. Deadline for Questions (EST) (No Questions entertained past the deadline) 4/22/22 12:00 PM

Post-Bid

Roads / Highways

$400,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
177
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 30, 2022

Project location map

Multiple Locations, Detroit, MI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed