BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Columbus, Ohio. Contact the soliciting agency for additional information.

To establish an Indefinite Quantity Agreement for Liquid CO-2 Storage Tank Inspection, Preventive Maintenance and Service, including parts, on an as needed basis. The estimated dollar amount to be spent on this agreement is $50,000.00. This is an estimate of the annual needs of the City under this Agreement and are for bidding purposes only. This estimate is not to be construed as representing an actual order for that amount, or a guarantee that any minimum amount will actually be purchased. Subsequent to the acceptance of an offer, individual written purchase orders may be issued as needed by the City to purchase items listed herein during the term of the agreement. At no time shall the obligation of the City agency exceed the dollar amount of an associated purchase order. The Agreement will expire on 10/31/23. Any available funds not obligated by the City by means of a Purchase Order on or prior to that date shall be cancelled after that date. CARBON DIOXIDE STORAGE UNIT ANNUAL INSPECTION AND MAINTENANCE SERVICES Service Visit includes the following: Inspection and Evaluation of the refrigeration, vaporizer, vapor heating and external piping systems, Assessment of the integrity of equipment control panels, pressure switches, contactors, the condition of wire connections and the operation of pressure switches, Leak Checks of CO2 piping, pH probes will be calibrated and tested. For WTP's with automatic pH control panels, the complete control system will be tested and tuned including: Checking the control parameters: Valve controller program, Transit time, Dead band, Valve Response, Disturbing the system to verify system stability The equipment includes, but is not limited to: The Dublin Road Water Plant has two (2) 120 ton units: Two (2) Tomco2 1-Job #WT-658, WT-1408. 120 ton capacity carbon dioxide storage units. Each unit is equipped with a low temperature air-cooled Copeland refrigeration condensing unit charged with refrigerant R-404A and an external electrically heated vaporizer. The Parsons Avenue Water Plant has three (3) 50 ton units: Three (3) Tomco-Job #WT-1444; 50 Ton capacity carbon dioxide storage units. Each unit is equipped with a low temperature air-cooled Copeland refrigeration condensing unit charged with refrigerant R-404A and an external electrically heated vaporizer. The Hap Cremean Water Plant has two (2) 100 ton units: Two (2) Tomco2 1-Job #WT-586, WT-1380. 100 Ton capacity carbon dioxide storage units. Each unit is equipped with a low temperature air-cooled refrigeration condensing unit charged with refrigerant R-404A and an external electrically heated vaporizer. Prices shall be FOB Destination Freight Prepaid & Allowed unless otherwise specified. For all lines please provide the unit cost as requested. These lines are representative items and the quantities are estimates that will be used for evaluation purposes.

Post-Bid

Water / Sewer

$50,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
46
Bidding Soon
1,016
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

November 25, 2022

img_map_placeholder

Multiple Locations, Columbus, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.