EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Edmond, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project(s) consists of the re-construction of and the relocation of an existing sanitary sewer line and furnishing all required materials, supplies, equipment, and tools plant to perform all necessary labor, as detailed by the plans and spec- ifications. All questions shall be submitted in writing to the engineer BY EMAIL, TO THE EMAIL ADDRESS PROVIDED above, NO LATER THAN Monday, April 25, 2022. THE CONTRACT REQUIRES VARIOUS PORTIONS OF THE PROJECTS TO BE SUBSTAINTIALLY COMPLETE AND Useable BY June 30th, 2022. All blank spaces for bid prices must be filled in, in ink or typewritten. The sum or total bid will be written in both words and figures. Contractors may bid one or more projects, or provide a single bid consisting of all projects, with each bid submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. Bid Bonds will be returned to the unsuccessful bidders as provided for by the specifications. Each bid submitted is a legal offer and when accepted by EDMOND PUBLIC SCHOOLS, constitutes a FIRM AND BINDING CONTRACT. EDMOND PUBLIC SCHOOLS reserves the right TO AWARD CONTRACTS BASED UPON CONTRACTOR'S ABILITY, PLANT, AND CURRENT WORK LOAD, BID PRICE AND PROJECT LOCATION AND TO REJECT ANY or ALL BIDS. Edmond Public Schools reserves the unconditional right to cancel all or any portion of this project within thirty (30) days from the date of opening of bids, for any reason and at its sole discretion.

Award

Sidewalks / Parking Lot

$675,682.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
27
Bidding Soon
485
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 Bond Edmond Public Schools Parking Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.