BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Jacksonville, Florida. Completed plans call for the renovation of a military facility.

N69450-22-D-0002/0003/0004/0005/0006/0007/0008/0009 Item 0001, Base Bid - Mayport Transformer at Echo-1: The Base Bid shall include a complete design and specification, demolition, renovation, calculations, installations and construction driven by the addition of a new Delta-Wye substation type transformer of 3.75 MVA capacity, a new switchboard/switchgear docked/connected to the new transformer and a new ship-to-shore 12 receptacles power igloo to the existing electrical system at this wharf. It shall include but not limited to all civil, structural, architectural, fire protection, electrical works for the addition of the new electrical equipment aforementioned, (and any other equipment as required) and the construction of a CMU that will house the new transformer and the new switchboard/switchgear as described throughout the RFP. Item 0002, Option 1- Mayport Transformer at Echo-3: The Bid Option shall include a complete design and specification, demolition, renovation, calculations, installations and construction driven by the addition of a new Delta-Wye substation type transformer of 3.75 MVA capacity, a new switchboard/switchgear docked/connected to the new transformer and a new ship-to-shore 12 receptacles power igloo to the existing electrical system at this wharf. It shall include but not limited to all civil, structural, architectural, fire protection, electrical works for the addition of the new electrical equipment aforementioned, (and any other equipment as required) and the construction of a CMU that will house the new transformer and the new switchboard/switchgear as described throughout the RFP. Item 0003, Option 2 - Re-Roofing: Remove existing roofing materials over existing building(s). Apply new roofing over existing building(s) in the same manner as specified for the new addition(s), at the same time the new roofing is installed over the new addition(s). Roofing shall be continuous and watertight over both areas. Provide a 20 year installation guarantee from the installer that includes the manufacturer's material guarantee.

Post-Bid

Military

$10,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
33
Bidding Soon
625
All Active Projects
265
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

August 1, 2022

img_map_placeholder

To Be Determined, Jacksonville, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.