Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Lake Elsinore, California. Contact the soliciting agency for additional information.
The goal of this project is to evaluate multiple products/technologies and determine their feasibility of improving lake-wide water quality conditions in Lake Elsinore through the treatment and/or physical removal of algal biomass. The objectives of the pilot scale study are to: 1) collect empirical data on algal treatment/removal technologies in Lake Elsinore; and 2) provide analysis of the feasibility in reducing water column chlorophyll-a concentrations and subsequent water quality responses. This will be a pilot study to test and evaluate multiple potential products/technologies that can be used in the short-term to reduce periodic localized cyanobacterial blooms and/or serve as longer-term strategies for annual dampening of the lake-wide bloom cycle. At the end of this pilot study, the resulting empirical data and analysis will be reviewed by a third-party scientific panel to determine the most effective and value-added products/technologies tested. Proposing firms will then be narrowed down to 2-4 firms/vendors who will be considered for a future larger scale study and implementation strategy for the lake. Both in-lake treatments or shoreline-based pass-through water treatment pilot studies will be considered. The City of Lake Elsinore will have a certified algicide applicator available for use, if required. If an in-lake isolation treatment is the desired pilot study design (e.g., isolating a small section of the lake with weighted curtains), please provide a full description of area and requirements needed as part of the study design. The firm/vendor will be responsible for providing all equipment necessary for the isolation treatment with the possibility that the City of Lake Elsinore may provide weighted curtains. The project scope will require the firms/vendors to complete the following tasks: 1. Describe a pilot-scale study experimental approach (demonstration) and cost estimate for each proposed study. In-lake studies are desired, however small mesocosms placed adjacent to the lake can be available and will be considered. 2. Conduct a short-term pilot-scale study on Lake Elsinore over the summer of 2022 (time window of Aug 1 to Oct 30) exhibiting the capability of vendors/firms to reduce algal biomass. This will include the collection of empirical data demonstrating algal concentration reduction, as well as relevant associated water quality responses. 3. Produce a pilot-scale study data report summarizing algal treatment results and subsequent water quality responses. 4. We recognize that certain treatment technologies require infrastructure and may take several weeks or months to effectively demonstrate quantifiable effects on algal reduction. If it is determined that a pilot-scale study will not be adequate to showcase a specific treatment, use existing Lake Elsinore data to demonstrate (through modelling or other data exercise) what the impacts of the product/technology will be on algal biomass and associated water quality parameters in Lake Elsinore. This option would specifically have to use data derived from Lake Elsinore and empirically demonstrate how the treatment would reduce algal biomass. 5. All interested firms should also provide a description of a desired lake-wide treatment plan and cost estimate in the event that the technology is selected for future full-scale treatments (see below). 6. If applicable, address any permitting needs, pertaining to the product/technology used. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Q&A Deadline 04/22/2022 11:59 PM (PDT)
Post-Bid
Water / Sewer
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2022
June 20, 2022
Multiple Locations, Lake Elsinore, CA
Related To This Project
Lake Elsinore, CA
Bid Date: Sep 07 2021
Lake Elsinore, CA
Bid Date: Nov 12 2019
Lake Elsinore, CA
Bid Date: Aug 08 2019
Lake Elsinore, CA
Bid Date: Jun 09 2022
Lake Elsinore, CA
Bid Date: Jul 14 2021
Lake Elsinore, CA
Bid Date: Sep 09 2021
Lake Elsinore, CA
Bid Date: Jun 18 2019
Lake Elsinore, CA
Bid Date: May 18 2022
Lake Elsinore, CA
Bid Date: Feb 16 2022
Lake Elsinore, CA
Bid Date: May 11 2021
Lake Elsinore, CA
Bid Date: Oct 16 2024
Lake Elsinore, CA
Bid Date: May 11 2022
Lake Elsinore, CA
Bid Date: May 05 2022
Lake Elsinore, CA
Bid Date: Aug 10 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.