Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 26, 2022 at 8:00 PM
Updated April 3, 2024
Renovation of a power facility in Cameron, Arizona. Completed plans call for the renovation of a power facility.
Engineer, Procure, & Construct) Navajo Tribal Utility Authority (NTUA) is hereby contacting qualified Solar Generation contractors to Design & Build a minimum output of 200 MW Photovoltaic (PV) Solar Generation Facility in Cameron, AZ Instructions and Scope of Work can be obtained from Alvester B. Chee, Contract Administrator, at (928) 729-6249 or by email AlvesterC@ntua.com or at NTUA Purchasing Department, North Navajo Route 12, Fort Defiance, Arizona. No late, facsimiled, or electronic mailed proposals will be accepted. To ensure delivery by the due date and time, all proposals should be addressed to: PHYSICAL ADDRESS: Navajo Tribal Utility Authority ATTN: Alvester B. Chee, Purchasing Department North Navajo Route 12 (Fed Ex/UPS/Hand-Deliver) Fort Defiance, Arizona 86504 Preference will be applied in accordance with the Navajo Business and Procurement Act (12 N.N.C. 1501 et seq.); the Navajo Nation Procurement Act (12 N.N.C. 301 et seq.); the Navajo Nation Business Opportunity Act (5 N.N.C. 201 et seq.) and other applicable statutory and regulatory requirements. Proposers must submit evidence of their Preference Priority Certification if applicable. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. Questions Due May 11,2022, 10am (MST), Answers to Questions May 17,2022. Proposals Due to NTUA : May 25, 2022;4 pm (MDST) Evaluation of Proposals/Interviews :May 26/june 10,2022 Short List - Best and Final Offer : June 6, 2022 Release of form Engineering, Procurement and Construction : June 13,2022 Agreement to BAFO Notice recipients June 13,2022 BAFO Proposals Due to NTUA June 16,2022 Selection and Notice of Award June 29, 2022 Contract Negotiation (If Necessary) June 30-21,July 15,2022 Award Contract/Notice to Proceed July 25, 2022
Post-Bid
Solar Power Generation
$440,000.00
Public - Federal
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2022
December 1, 2022
To Be Determined, Cameron, AZ
Related To This Project
Cameron, AZ
Bid Date: Dec 13 2022
Cameron, AZ
Bid Date: Mar 18 2022
Cameron, AZ
Bid Date: Sep 15 2022
Cameron, AZ
Bid Date: May 10 2024
Joseph City, AZ
Bid Date: Dec 16 2022
Mesa, AZ
Bid Date: Apr 27 2023
Prescott Valley, AZ
--
Bullhead City, AZ
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
