Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Montclair, California. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
The Work Site is primarily located within the Montclair Basin No. 2 flood control and groundwater infiltration basin located immediately south of Moreno Street and east of the San Antonio Creek Channel, City of Montclair, CA 91763. The work generally consists of the removal of the existing concrete lined, open channel inflow spillway structure in Montclair Basin No. 2; construction of a new concrete spillway structure in Montclair Basin No. 2; removal of the intake structure in Montclair Basin No. 1; construction of a new intake structure in Montclair Basin No. 1; and low-pressure grouting of voids beneath the existing box culvert structures which convey flows from Montclair Basin No. 1 to Montclair Basin No. 2 under Moreno Street. The Contract for the work will be awarded upon the basis of the total base bid price of the Bid Schedule. The Engineer s estimate is approximately $1,000,000. This is a public works project and the contractor's and all subcontractor's employees must be provided certain benefits pursuant to Section 1720 et. seq. of the Labor Code, including the payment of prevailing wage rates if DIR has established prevailing wage rates for the work. The Owner has obtained, from the Director of the Department of Industrial Relations, the prevailing wage rates applicable to the work. Payment for the work accomplished will be made monthly, but part of the amount earned will be withheld to ensure performance under the Contract. Substitution of securities for the monies withheld is permitted by the Contract Documents as an option open to the Contractor, pursuant to the provisions of Section 22300 of the Public Contracts Code. Proposals shall be prepared in accordance with the requirements set forth in the Contract Documents, on the forms therein or copies thereof, and shall be accompanied by bid security in an amount not less than 10% of the amount of the bid. Upon being awarded the contract, Contractor shall provide a 100% Public Works Payment Bond and a 100% Performance Bond. Except for contractors who work exclusively on small public works projects (defined below), all contractors and subcontractors who bid or work on a public works project must be registered with the Department of Industrial Relations (DIR) and pay an annual fee. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with DIR. No contractor or subcontractor may be awarded a public works contract unless registered with DIR. (Labor Code 1771.1.) Small Project Exemption - Contractors who work exclusively on small public works projects are not required to register as a public works contractor or file electronic certified payroll reports for those projects. These contractors are still required to pay prevailing wages, maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner s Office upon request. The small project exemption applies for all public works projects that do not exceed: a. $25,000 for new construction, alteration, installation, demolition or repair; b. $15,000 for maintenance. The Contractor must post all job site notices required by regulation. This project is subject to compliance monitoring and enforcement by DIR. (Labor Code 1771.4.) No Proposal will be accepted from a contractor who has not been licensed in accordance with the laws of this State to perform the work herein described and who does not possess a Class A license or its equivalent for the type of work called for under this project. The Owner reserves the right to reject any or all Proposals, or any Proposal not conforming to the intent and purpose of the Contract Documents, and to postpone the award of the Contract for a period of time which, however, shall not extend beyond 90 days from the bid opening date. The Contract time for performance shall begin on the date specified in the written Notice to Proceed and shall not commence prior to July 1, 2022 and shall extend through October 1, 2022. Project Implementation Milestones / Schedule Milestone Deliverables Estimated Date Construction 1. Begin construction Notice to Proceed March 1, 2022 2. Construct two new diversion structures from the San Antonio Creek flood control channel Notice of completion and submittal of as-built diagrams July 31, 2022 3. Repair existing spillway Notice of completion and submittal of as-built diagrams October 31, 2022 4. Complete Construction Notice of completion October 31, 2022 Monitoring and Reporting 5. Monitoring and Reporting Begin Notice of start of monitoring November 1, 2022 6. Annual Monitoring Report 1 Monitoring Report October 31,2023 DocuSign Envelope ID: A89CA3DD-FB89-4EFF-B7EB-79B6446B99D9 IEUA 31 Agreement No. 204147 (New Construction) Milestone Deliverables Estimated Date 7. 7. Annual Monitoring Report 2 Monitoring Report October 31, 2024 8. 8. Final Annual Monitoring Report 3 Final Monitoring Report October 31,2025 9. 9. Final Payment by Metropolitan Final Payment December 31, 2025
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 18, 2022
July 1, 2022
4594 San Bernardino St, Montclair, CA
Related To This Project
Montclair, CA
Bid Date: Jun 09 2022
Montclair, CA
Bid Date: Jan 18 2023
Montclair, CA
Bid Date: Jul 11 2022
Montclair, CA
Bid Date: Apr 08 2020
Montclair, CA
Bid Date: Jul 23 2020
Montclair, CA
Bid Date: May 23 2019
Montclair, CA
Bid Date: Feb 07 2023
Montclair, CA
Bid Date: Feb 06 2023
Montclair, CA
Bid Date: May 19 2022
Montclair, CA
Bid Date: Mar 02 2022
Montclair, CA
Bid Date: Jan 20 2022
Montclair, CA
Bid Date: Mar 15 2022
Montclair, CA
Bid Date: Jan 19 2023
Montclair, CA
Bid Date: Oct 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.