Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.

Empire Fulton Ferry Rip-Rap Revetment The Empire Fulton Ferry (EFF) revetment is located within Brooklyn Bridge Park between Main Street and Old Dock Street. The revetment requires reconstruction to address erosion and settlement issues currently exhibited along the existing riprap revetment. The project will replace the existing riprap revetment along approximately 490 linear feet of shoreline with a similar riprap structure. Dumbo Waterfront Encompasses approximately 1,800 linear feet of shoreline inclusive of Main Street park Shoreline, Adams Street Bulkhead, John Street Park Shoreline, and Jay Street Bulkhead and Connector. The scope of repairs includes the following: o Main Street Shoreline - Clean and reattach trash rack at an existing outfall, replace missing armor stone o John Street Shoreline - Replace missing armor stone o Jay Street Bulkhead - Surface concrete spall and erosion repairs o Adam Street Bulkhead - Concrete extension of bulkhead Adam's Street Esplanade Pavement Settling - This project will investigate the cause of settlement and fill loss observed in the area and will include the reconstruction of subgrade stability by way of pressured grout injections.

Bid Results

Water / Sewer

$2,306,500.00

Public - State/Provincial

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,243
Active Projects
487
Bidding Soon
7,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

August 20, 2022

Project location map

Multiple Locations, New York, NY

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed