BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway.

Scope of Project: The Installation of Traffic Signal for the intersection of Westgreen Boulevard at Summer Camp Drive includes work for the following: a. Signal Poles b. Signal Heads c. Mast Arms d. Traffic Signal Cabinet e. Conduit f. Traffic Signal Wiring g. Drilled Shaft for signal poles h. Sawcut and installation of loop detectors i. Construction surveying j. Pedestrian pushbutton and signal heads k. Signal activation QA Expiration Date has changed from 4/27/2022 10:00:00 AM CST to 5/3/2022 4:00:00 PM CST

Bid Results

Roads / Highways

$329,892.00

Public - County

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
206
Bidding Soon
3,479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

June 3, 2022

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.