Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 5, 2022 at 8:00 PM
Updated September 14, 2023
Site work for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway.
Scope of Project: The Installation of Traffic Signal for the intersection of Westgreen Boulevard at Summer Camp Drive includes work for the following: a. Signal Poles b. Signal Heads c. Mast Arms d. Traffic Signal Cabinet e. Conduit f. Traffic Signal Wiring g. Drilled Shaft for signal poles h. Sawcut and installation of loop detectors i. Construction surveying j. Pedestrian pushbutton and signal heads k. Signal activation QA Expiration Date has changed from 4/27/2022 10:00:00 AM CST to 5/3/2022 4:00:00 PM CST
Bid Results
Roads / Highways
$329,892.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
